Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Erosion control plan threshold
More than 10,000 square feet disturbed, non-agricultural
Silt fencing timing
At least 2 days before earth moving
Silt traps
Swales or ditches exceeding 300 feet, and detention basin entrances
Unvegetated limit
6 months for active earth-moving areas
Lake Miola grade change
No cut or fill over 2 feet from original grade
Failed erosion measures
Failed inspection, future inspections denied

Summary

Paola requires an erosion control plan for any non-agricultural development that disturbs ground cover on more than 10,000 square feet, with silt fencing, silt traps and ground cover re-established on set timelines. Separately, City Code § 4-111 requires best management practices on construction involving substantial earthwork, including new single-family homes.

All development disturbing ground cover for other than agricultural purposes on areas exceeding ten thousand (10,000) square feet shall submit an erosion control plan. Those plans shall locate all required structures and ground cover requirements. Special requirements are required in the Lake Miola watershed (Section 13.430). ... If required by conditions and existing or proposed topography, the following structures shall be provided. The City’s Director of Public Works shall approve such structures. A. Silt fencing shall be installed at least two (2) days prior to the start of earth moving along the following: 1. All wetlands, ponds, and floodplains to prevent silting of those areas. ... B. Temporary silt traps shall be installed along swales or ditches exceeding three hundred (300) feet or as required by swale or ditch slope. ... Ground cover shall be re-established as soon as practical within the construction period. In any event, only active earth-moving areas shall be left unvegetated for more than six (6) months.

Full Breakdown

Division 13.400 of the Land Development Ordinance (Appendix C) applies to all development disturbing ground cover for other than agricultural purposes on areas exceeding ten thousand square feet. Those developments submit an erosion control plan that locates all required structures and ground cover requirements. Under Section 13.410, when conditions and existing or proposed topography call for it, structures must be provided, and the Director of Public Works approves them. Silt fencing goes in at least two days before earth moving along all wetlands, ponds and floodplains, along the entire down-stream border of water supply watersheds, and anywhere drainage would enter a terraced area on adjoining farmland. Temporary silt traps go along swales or ditches exceeding three hundred feet, or as the slope requires, and at the entrance to all detention basins.

Section 13.420 requires ground cover to be re-established as soon as practical within the construction period, and only active earth-moving areas can stay unvegetated for more than six months. Cool season grasses are seeded between February 15 and April 30 or between August 15 and September 30, and other temporary cover is required when land cannot be seeded within those periods. Ditches with a slope greater than four percent use erosion control measures approved by Staff, and areas planted with grass use a 1:3 maximum slope ratio for ease of mowing.

Section 13.430 adds standards to protect the Lake Miola water supply reservoir. Subdivision and land development plans go to the Miami County Soil and Water Conservation District for review, and the district recommends best management practices and long-term maintenance of detention and erosion control measures. If long-term maintenance is required, a special assessment district is created to maintain the system. Extra silt fencing or sedimentation structures can be required during construction, mass grading can be prohibited, and no cut or fill can change the original grade of a lot by more than two feet, with foundations stepped to stay within those limits.

The building code adds its own layer. Section 4-111(c) of the City Code requires appropriate best management practices on site, as the code official requires, for all new and existing construction involving substantial earthwork, land excavation or disturbance of soil, and the section states that this includes new single-family residential construction.

Violations & Fines

Section 4-111(d) enforces the rule through inspections. Best management practices are inspected with the first project inspection, and their maintenance is checked in routine inspections throughout construction. If they are not in place and maintained, the project fails the inspection and future inspections are denied until the measures are installed or brought up to working order. A person convicted of violating Chapter 4 faces a fine not to exceed $500.00 (§ 4-113(b)).

Frequently Asked Questions

Does a new single-family home in Paola need erosion controls?
Yes. Section 4-111(c) requires appropriate best management practices on site, as the code official requires, for new and existing construction involving substantial earthwork, land excavation or disturbance of soil, and it names new single-family residential construction. The measures are checked starting with the first project inspection.
When must grass be seeded after grading in Paola?
Section 13.420 puts cool season grass seeding between February 15 and April 30 or between August 15 and September 30. Other forms of temporary cover are required if the land cannot be seeded within those periods, and only active earth-moving areas can stay unvegetated for more than six months.
What extra rules apply in the Lake Miola watershed?
Plans go to the Miami County Soil and Water Conservation District for review. The City can require extra silt fencing or sedimentation structures, can prohibit mass grading, and allows no cut or fill that changes the original grade of a lot by more than two feet. Foundations are stepped to remain within that limit.
Who approves the silt fences and traps?
The City Director of Public Works approves the structures listed in Section 13.410 whenever conditions and the existing or proposed topography call for them. Ground cover other than grass must be approved by Staff, must be indigenous, and is limited to areas of low pedestrian traffic under Section 13.420.

Sources & Official References

Other rules in Paola

All Paola rules

Compare Paola to another location·View the Kansas environmental rules overview

Get notified when Erosion Control in Paola, KS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.