Rohnert Park, CA Environmental Rules: Erosion Control (2026)
Key Facts
- Governing chapter
- RPMC Chapter 15.52
- Rainy season supply requirement
- October through April
- Interim plan deadline
- Measures operational by October 15
- Inspection notice required
- 2 working days to engineering dept.
- Penalty class
- Misdemeanor, chargeable as infraction
Summary
Rohnert Park requires an erosion and sediment control plan with any grading permit under Chapter 15.52, and construction sites must keep enough erosion-control supplies on hand through the October-to-April rainy season. Violations are misdemeanors that can be charged down to infractions and carry restoration costs.
15.52.010 - Purpose. The purpose of this ordinance is to regulate grading on public and private property in order to control erosion and sedimentation, protect water quality, and safeguard health, safety, and the public welfare, and to establish administrative procedures to carry out these regulations. ... 15.52.040 - Design standards for erosion control plans ... D.The following general site and good housekeeping requirements shall be implemented and are special provisions of any grading permit issued:1.Sufficient erosion and sediment control supplies shall be available on site during the rainy season (October through April) to protect areas susceptible to erosion during rain events. Contractors shall be prepared year-round to deploy erosion and sediment treatment control practices;
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 51 Update 2).
Full Breakdown
52, Erosion and Sediment Control, regulates grading on public and private property to control erosion and sedimentation and protect water quality. 030, an erosion and sediment control plan prepared by a registered civil engineer or other qualified professional must be submitted with any grading permit application, detailing vegetative and mechanical erosion measures, drainage control, tree and vegetation protection, dust control, and sediment retention devices, among other required elements. An interim plan is required before each rainy season for projects under a multi-season permit, and must be submitted early enough for city review and approval before September 15, with the plan's measures in place and operational before October 15.
040 sets the design standards: grading, erosion control and sediment control practices must follow the California Stormwater Quality Association Best Management Practice Handbook, and the ordinance's general housekeeping requirements are made special provisions of every grading permit issued. Sufficient erosion and sediment control supplies must be available on site during the rainy season, October through April, to protect areas susceptible to erosion during rain events, and contractors must be prepared year-round to deploy erosion and sediment treatment controls. Soil stabilization must be completed within five days of clearing or a pause in construction, and concrete washout areas must be set up at least fifty feet from storm drain inlets.
060 require two working days' notice to the city engineering department before key milestones such as start of construction, installation of sediment controls, and completion of rough and final grading, and grading permit holders must keep their own written inspection records on site.
Violations & Fines
Violating any term of the erosion and sediment control ordinance, including prohibited practices such as improper chemical storage, washing concrete washout into a street or storm drain, or leaving stockpiles uncovered, is a misdemeanor under Section 15.52.070, though the enforcing authority can instead charge and prosecute it as an infraction. Each day a violation continues is a separate offense, and a convicted violator must also bear the cost of restoration in addition to any other penalty under Section 1.16.010. The city engineer may also issue a stop-work order or suspend or revoke the grading permit for violations that are materially detrimental to the neighborhood.
Frequently Asked Questions
Do I need an erosion control plan for a grading project?
What erosion control supplies must stay on site during winter?
What is the penalty for violating Rohnert Park's erosion control rules?
Sources & Official References
Other rules in Rohnert Park
California rules heatmap·Compare Rohnert Park to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Sonoma County handle erosion control.