Union City, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Grading, excavation or fill
Exemption
≤10,000 sq ft, ≤50 cu yd
Engineered grading
Required above 5,000 cu yd
Application
Drainage plan required
Issued by
Public Works Director

Summary

Union City requires a permit before any grading, filling, excavation or land-disturbing activity, with drainage facilities reviewed as part of the site map and grading plan under Title 21.

No person may grade, fill, excavate, store or dispose of soil and earth materials or perform any other land-disturbing or land-filling activity without first obtaining a permit as set forth in this title.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4940544; v16 updated 2026-06-23).

Full Breakdown

Under Municipal Code § 21.08.010, no one may grade, fill, excavate, store or dispose of soil or earth materials, or otherwise disturb land, without a permit issued by the Public Works Director. The site map and grading plan submitted with the application must show existing and proposed drainage facilities, contour intervals extending at least 100 feet off-site, and estimated runoff for each drainage area. Small projects are exempt: disturbances of 10,000 square feet or less, slopes under 10%, and no more than 50 cubic yards of soil moved. Engineered grading is required above 5,000 cubic yards.

Violations & Fines

Grading without a permit, or work that departs from the approved plan, can result in permit suspension or revocation, forfeiture of posted security, and prosecution as a misdemeanor.

Frequently Asked Questions

Do I need a permit to grade my yard in Union City?
Only if the work exceeds the exemption threshold: disturbing more than 10,000 square feet, moving over 50 cubic yards of soil, or affecting drainage beyond the small-project limits triggers a Title 21 grading permit.
Who reviews drainage plans for grading projects?
The Public Works Director reviews the site map and grading plan, including drainage facility design and runoff calculations, before issuing a grading permit under Municipal Code Title 21.

Sources & Official References

Other rules in Union City

All Union City rules

California rules heatmap·Compare Union City to another location·View the California environmental rules overview

Get notified when Erosion Control in Union City, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Alameda County handle erosion control.

Livermore, CA
Some Restrictions
Hayward, CA
Some Restrictions
San Leandro, CA
Some Restrictions
Oakland, CA
Some Restrictions
Fremont, CA
Significant Restrictions