Westminster, CO Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit threshold
1 acre or larger disturbance
BMP removal deadline
14 days after stabilization
Maximum administrative fine
$1,000 per violation per day
Financial guarantee
115% of BMP construction cost
Appeal window
10 days after notice of violation
Permit issued by
Engineering Division, Community Services

Summary

Westminster requires erosion and sediment controls on every land-disturbing project under Chapter 11 of Title VIII. Any grading, excavation or ground disturbance covering an acre or more needs a land disturbance permit and an approved stormwater management plan before work starts, and temporary best management practices like silt fence and inlet filters must go in before dirt moves.

(A)Any person who undertakes or causes to be undertaken any activity that involves disturbance of the surface of land shall ensure that soil erosion, sedimentation, increased pollutant loads and changed water flow characteristics resulting from the activity are controlled, so as to minimize pollution of receiving waters. The requirements of this Chapter are minimum standards and a person's compliance with the same shall not relieve such person from the duty of enacting all measures necessary to minimize pollution of receiving waters.(B)All temporary BMPs shall be installed before any land disturbance operations take place....(F)Sediment caused by accelerated soil erosion shall be removed from stormwater runoff water before it leaves the site of the land disturbance.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 12).

Full Breakdown

makes anyone who disturbs the surface of land responsible for controlling soil erosion, sedimentation and changed runoff so pollution of receiving waters stays minimized, and compliance with the chapter's minimum standards does not excuse a person from taking whatever extra steps are needed to protect water quality. Temporary BMPs, such as silt fence, wattles, vehicle tracking pads and sediment ponds, must be installed before any land disturbance operations begin, and sediment must be removed from runoff before it leaves the site. Under Section 8-11-5, a land disturbance permit is required whenever a project covers one acre or more, whenever a smaller site is part of a larger planned development, whenever the City Manager determines the area is environmentally sensitive, or whenever the City Manager otherwise deems a permit necessary.

Permit applications go through the Engineering Division in the Department of Community Services, and the fee set under Section 11-1-6 is non-refundable. Projects at or above the one-acre threshold must also prepare a Stormwater Management Plan under Section 8-11-6, describing the temporary BMPs and stormwater treatment facilities that will control pollutant loading before the City will accept the plan. Once a project is stabilized, Section 8-11-7 gives the permittee 14 calendar days to pull out the temporary BMPs, and responsibility for permanent stormwater treatment facilities continues in perpetuity, including disclosure to any buyer of an individual lot before closing. A permit cannot be closed out until final stabilization is achieved and the separate state stormwater construction permit is closed as well.

Violations & Fines

The City Manager can issue a written notice of violation, order a compliance schedule, or call a show cause hearing under Section 8-11-10. Administrative citations run up to $1,000 per violation per day, and a violator has ten days to appeal the fine in writing with full payment. Unresolved violations can lead to a civil suit for up to $1,000 per day plus attorneys' fees, a discontinued storm sewer connection, or revocation of the land disturbance permit.

Frequently Asked Questions

Do I need a permit to regrade less than an acre in Westminster?
Only if the smaller site is part of a larger planned development, sits in an area the City Manager has flagged as environmentally sensitive, or the City Manager otherwise decides a permit is necessary under Section 8-11-5, W.M.C. Most one-off residential landscaping jobs under an acre and outside a planned development fall below the permit trigger.
What happens to silt fence and sediment ponds after construction ends?
Section 8-11-7 requires the permittee to remove every temporary BMP within 14 calendar days once final stabilization is achieved, while any permanent stormwater treatment facility built under the approved plan must be maintained by the property owner indefinitely, with responsibility disclosed to a buyer before closing on an individual lot.
Who enforces Westminster's erosion control chapter?
The City Inspector and City Manager enforce Chapter 11 of Title VIII. Inspectors have a right of entry to check compliance, and if refused access while showing probable cause of a violation, the City Inspector can seek a search warrant from the municipal court under Section 8-11-9.
What is the maximum fine for an erosion control violation?
Section 8-11-10(G) sets a per-violation fine of up to $1,000 per day. A cited party can request the City Manager reconsider within ten days of the notice, but full payment of the fine must accompany the written appeal request.

Sources & Official References

Other rules in Westminster

All Westminster rules

Compare Westminster to another location·View the Colorado environmental rules overview

Get notified when Erosion Control in Westminster, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Adams County handle erosion control.

Thornton, CO
Some Restrictions