Anaheim, CA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum freeboard
1 foot above base flood elevation
Zone AO alternative
FIRM depth number plus 1 ft, or 3 ft minimum
Certification required
Registered engineer or surveyor, before final inspection
Enclosure vent ratio
1 sq in per sq ft of enclosed area
Administering office
Planning Director under AMC 17.28.120
Max penalty
$1,000 fine and/or 6 months jail

Summary

In Anaheim's mapped special flood hazard areas, new construction and substantially improved structures must raise the lowest floor, including any basement, at least one foot above the base flood elevation. A registered engineer or surveyor must certify the elevation before final inspection.

New construction and substantial improvement of any structure shall have the lowest floor, including basement, elevated at least one foot above the base flood elevation. Nonresidential structures may meet the standards in Section 17.28.130.022. Prior to final building and zoning inspections, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor and an elevation certificate completed and provided to the Planning Director, or his or her designee.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-28: Code: Supplement contains: Local legislation current through Ord. 6627, passed 8-11-2026 | Zoning: Local legislation current through Ord. 6627, passed 8-11-2026).

Full Breakdown

28 implements the National Flood Insurance Program locally. 031 requires that new construction and substantial improvement of any structure have the lowest floor, including basement, elevated at least one foot above the base flood elevation (BFE), the one-foot freeboard above FEMA's mapped 100-year flood level. 033: making the structure watertight below the base flood level with walls substantially impermeable to water and structural components capable of resisting hydrostatic and hydrodynamic loads, certified by a registered engineer or architect. 032 instead requires the lowest floor to sit above the highest adjacent grade by the FIRM depth number plus one foot, or at least three feet if no depth number is shown.

031 requires a registered professional engineer or surveyor to complete an elevation certificate documenting the as-built lowest floor elevation and submit it to the Planning Director. 035. 100 is required before any construction begins in a special flood hazard area, and the applicant's engineer or architect must submit the proposed lowest floor elevation relative to mean sea level as part of that application. 125.

Violations & Fines

Anaheim Municipal Code Section 1.01.370 makes violation of any mandatory Code requirement, including the Chapter 17.28 elevation standards, a misdemeanor punishable by a fine of up to $1,000, up to six months in jail, or both, with each day of continuing violation a separate offense. Property owners who believe strict compliance imposes exceptional hardship may seek a variance from the City Engineer or Planning Director under Section 17.28.190, with appeals decided by the City Council; variances cannot be granted within a designated floodway if they would raise flood levels.

Frequently Asked Questions

How high above the base flood elevation must a new home's lowest floor be in Anaheim?
At least one foot above the base flood elevation, measured to the lowest floor including any basement. Anaheim Municipal Code Section 17.28.130.031 requires this freeboard for all new construction and substantial improvements in a mapped special flood hazard area, and a registered engineer or surveyor must certify the finished elevation before final inspection.
Can a commercial building in Anaheim floodproof instead of elevating?
Yes. Section 17.28.130.033 lets nonresidential structures floodproof below the base flood level instead of raising the lowest floor, provided the structure is watertight, its walls are substantially impermeable, and its structural components can resist hydrostatic and hydrodynamic loads. A registered engineer or architect must certify the design to the Planning Director.
What happens if a basement below the flood elevation is used for parking?
Section 17.28.130.035 requires at least two flood vent openings with combined net area of one square inch per square foot of enclosed area, positioned no higher than one foot above grade, so flood water can enter and exit and equalize pressure on the walls rather than causing structural collapse.

Sources & Official References

Other rules in Anaheim

All Anaheim rules

California rules heatmap·Compare Anaheim to another location·View the California environmental rules overview

Get notified when Flood Elevation Requirements in Anaheim, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Orange County handle flood elevation requirements.

Santa Ana, CA
Some Restrictions
Irvine, CA
Some Restrictions
Fullerton, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Orange, CA
Some Restrictions
Newport Beach, CA
Some Restrictions
Mission Viejo, CA
Some Restrictions
Costa Mesa, CA
Some Restrictions