Key Facts

Base flood
One-hundred-year flood, one-percent chance in any given year
Data trigger
More than 50 lots or five acres in unnumbered A Zones
Site plan
Seven copies at one inch equals 40 feet, two-foot contours
Review period
Building Commissioner waits for reports or 15 days
Elevation records
Lowest floor and floodproofing kept for public inspection
Fine
Up to $200 per violation

Summary

In the City of Chicopee, Massachusetts, § 275-64 requires base flood elevation data for developments over 50 lots or five acres in unnumbered A Zones, requires the site plan to show the base flood elevation, and has the Building Commissioner keep lowest-floor elevation and floodproofing records for public inspection.

(2) Base flood elevation and floodway data. ... (c) Base flood elevation data is required for subdivision proposals or other developments greater than 50 lots or five acres, whichever is the lesser, within unnumbered A Zones. ... (3) When base flood data has not been provided in accordance with Subsection B, the Building Commissioner shall obtain, review and reasonably utilize any base flood elevation data available from federal, state and other sources as criteria for meeting the standards of this section. ... (c) The base flood elevation. ... (3) Records of the actual elevation, in relation to mean sea level, of the lowest floor and/or level of floodproofing, as well as certification of floodproofing, shall be maintained by the Building Commissioner, to be available for public inspection.

Full Breakdown

In the City of Chicopee, Massachusetts, base flood elevation is handled inside § 275-64, the Floodplain Overlay District of the Zoning Ordinance. The code defines base flood elevation as the elevation reached by the one-hundred-year flood, and defines the base flood as the one-hundred-year flood, the flood with a one-percent possibility of being equaled or exceeded in any given year. Boundaries follow the Hampden County Flood Insurance Rate Map and Flood Insurance Study report dated July 16, 2013.

Where data is required. Subsection B(2)(c) requires base flood elevation data for subdivision proposals or other developments greater than 50 lots or five acres, whichever is the lesser, within unnumbered A Zones. Where no base flood data has been provided under Subsection B, D(3) directs the Building Commissioner to obtain, review and reasonably utilize any base flood elevation data available from federal, state and other sources as the criteria for meeting the standards of the section.

Site plan requirements. Under G, a developer submits seven copies of a site plan at a scale of one inch equals 40 feet to the Department of Planning and Development. The plan shows lot locations, boundaries and dimensions, two-foot contours of the existing and proposed land structure, the base flood elevation, and the location of existing and proposed structures, watercourses, drainage easements, means of access, leaching fields, drainage and sewage disposal facilities. The Department forwards the plan to the City Engineer, Highway Department, Water Department, Electric Light Department and Conservation Commission. The Building Commissioner takes no final action until reports arrive or 15 days pass after receipt without a report. The City Engineer provides benchmarks when the Building Commissioner asks.

Records. Under G(3), the actual elevation, in relation to mean sea level, of the lowest floor and/or level of floodproofing, along with certification of floodproofing, is maintained by the Building Commissioner and is available for public inspection. The code defines floodproofed as watertight with walls substantially impermeable to the passage of water.

Floodway limits. In Zones A and AE, encroachments in a regulatory floodway are prohibited if they would increase flood levels during the base flood discharge. Section 275-64 prints no freeboard figure of its own; construction standards come through the floodplain sections of the State Building Code (780 CMR) that C(1)(a) makes binding.

Violations & Fines

Under Chicopee Code § 275-19, any person or corporation violating a provision of the Zoning Ordinance can be fined up to but not more than $200 for each violation. The Building Commissioner levies the fine, and it can be appealed under § 275-8. Under § 275-5, the Building Commissioner refuses a permit for any construction or alteration that would violate the chapter.

Frequently Asked Questions

What is base flood elevation in Chicopee?
The Chicopee Zoning Ordinance defines base flood elevation as the elevation reached by the one-hundred-year flood. The base flood itself is the flood with a one-percent possibility of being equaled or exceeded in any given year. Flood zone boundaries follow the Hampden County Flood Insurance Rate Map and Study dated July 16, 2013.
When does a Chicopee developer have to supply base flood elevation data?
Section 275-64B(2)(c) requires base flood elevation data for subdivision proposals or other developments greater than 50 lots or five acres, whichever is the lesser, within unnumbered A Zones. Where no base flood data has been provided, the Building Commissioner uses available federal, state and other data as the criteria.
What must a Chicopee flood district site plan show?
Seven copies at a scale of one inch equals 40 feet go to the Department of Planning and Development. The plan shows each lot's location, boundaries and dimensions, two-foot contours, the base flood elevation, and existing and proposed structures, watercourses, drainage easements, access, leaching fields, drainage and sewage disposal facilities.
Does Chicopee keep elevation records for the public to see?
Yes. Section 275-64G(3) has the Building Commissioner maintain records of the actual elevation, in relation to mean sea level, of the lowest floor and/or level of floodproofing, plus certification of floodproofing. Those records are available for public inspection. The City Engineer provides benchmarks when the Building Commissioner requests them.
Does Chicopee's code set a freeboard requirement?
Section 275-64 does not print a freeboard figure. It ties development in the district to the floodplain sections of the Massachusetts State Building Code (780 CMR), among other state rules, and requires the base flood elevation to appear on the site plan. Violations of the Zoning Ordinance carry a fine of up to $200 each.

Sources & Official References

Other rules in Chicopee

All Chicopee rules

Compare Chicopee to another location·View the Massachusetts environmental rules overview

Get notified when Flood Elevation Requirements in Chicopee, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.