Key Facts
- Freeboard, AE/AH/A1-30
- 18 inches above base flood elevation
- AO Zone standard
- FIRM depth number, or 2 ft. minimum
- -F200 overlay standard
- Finished floor at/above 200-year flood level
- Certification required
- Registered civil engineer or licensed surveyor
- Nonresidential option
- Dry floodproofing with engineer certification
Summary
Lodi requires new and substantially improved residential structures in AE, AH, and A1-30 flood zones to elevate the lowest floor at least eighteen inches above the base flood elevation, six inches more than FEMA's federal minimum. Inside the city's mapped 200-year floodplain, the finished floor must sit at or above the 200-year flood elevation instead. A registered engineer or surveyor must certify the elevation.
C.Elevation and Floodproofing.1.Residential Construction. All new construction or substantial improvements of residential structures shall have the lowest floor, including basement:a.In AE, AH, A1-30 Zones, elevated to eighteen inches or more above the base flood elevation. ... d.In the -F200 overlay zone, finished floor shall be at or above the elevation of the 200-year flood.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 68).
Full Breakdown
180(C) sets Lodi's construction standards for the special flood hazard area. Residential structures in Zones AE, AH, and A1-30 must have their lowest floor, including any basement, elevated to eighteen inches or more above the base flood elevation; an AO Zone instead uses the FIRM's depth number above the highest adjacent grade, or two feet if no depth number is shown. Structures inside the city's -F200 overlay, covering the mapped 200-year floodplain along the Mokelumne River, must have their finished floor at or above the elevation of the 200-year flood, a higher local standard the city added on top of the federal 100-year requirement.
A registered civil engineer or licensed land surveyor must certify the as-built lowest-floor elevation, and the city's building inspector verifies it before the certification goes to the floodplain administrator. Nonresidential buildings may instead be dry-floodproofed below the required elevation if an engineer or architect certifies the walls are substantially impermeable and can resist hydrostatic and hydrodynamic loads. 180(C)(3).
Violations & Fines
Occupying or constructing a residence below the required freeboard elevation without the engineer's or surveyor's certification is treated as noncompliant under Chapter 15.60, and any structure lacking the required elevation certificate is presumed in violation until the documentation is provided. Violating the chapter's construction standards is a misdemeanor under Section 15.60.080, and the floodplain administrator can pursue any lawful remedy.
Frequently Asked Questions
How high above the flood line must a new Lodi home be built?
Does the 200-year floodplain along the Mokelumne River have a different rule?
Can a garage sit below the base flood elevation in Lodi?
Sources & Official References
Other rules in Lodi
California rules heatmap·Compare Lodi to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in San Joaquin County handle flood elevation requirements.