Key Facts

Governing article
Article 7-8-10, Floodplain Management/Flood Damage Prevention
Freeboard requirement
3 ft above BFE or 1 ft above future-conditions elevation
Administering official
Public Works Director
Max penalty
$1,000 fine and/or 60 days jail per violation
Variance appeal court
Cobb County Superior Court

Summary

Marietta's floodplain ordinance, City Code Article 7-8-10, requires new construction and substantial improvements in the future-conditions floodplain to elevate the lowest floor at least three feet above base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. The public works director administers the article.

"Base flood elevation" means the highest water surface elevation anticipated at any given location during the base flood. ... a.New Construction. New construction of principal residential structures shall not be allowed within the limits of the future-conditions floodplain unless all requirements of Subsections 7-8-10-040 C., D. and E. have been met. If all of the requirements of Subsections 7-8-10-040 C., D. and E. have been met, all new construction shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 56).

Full Breakdown

Article 7-8-10 defines "base flood elevation" as the highest anticipated water surface elevation during the base flood, itself the flood with a one percent annual chance of occurring, based on Flood Insurance Studies dated December 16, 2008, November 2, 2012, March 4, 2013 and October 5, 2018, plus any FEMA-approved engineering study. Section 7-8-10-050(B) sets the actual freeboard standard: new construction and substantial improvements of residential and non-residential buildings must have the lowest floor, including any basement, elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher, once the general standards in Sections 7-8-10-040(C), (D) and (E) are met.

Non-residential structures may floodproof to that same level instead of elevating, but a licensed engineer or architect must certify the design and file a FEMA floodproofing certificate. Enclosed areas below the lowest floor must have flood vents totaling at least one square inch per square foot of enclosed area, with the bottom of each opening no higher than one foot above grade. Manufactured homes and recreational vehicles face the same three-foot/one-foot elevation standard. 00 of coverage; appeals go to Cobb County Superior Court.

Violations & Fines

Under § 7-8-10-070, the public works director can issue a stop-work order, withhold a certificate of occupancy, or suspend or revoke the development permit for noncompliance. For intentional or flagrant violations, or where the applicant fails to cure after notice, a citation to municipal court can bring a fine of up to $1,000.00 and/or up to 60 days' imprisonment, with each day of violation a separate offense.

Frequently Asked Questions

How high above flood level must new construction be built in Marietta?
City Code § 7-8-10-050(B)(1)(a) requires the lowest floor, including any basement, of new residential construction in the future-conditions floodplain to be elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher.
What is Marietta's "base flood elevation"?
Under § 7-8-10-020, "base flood elevation" means the highest water surface elevation anticipated at any given location during the base flood, which the article defines elsewhere as the flood having a one percent annual chance of occurring, commonly called the 100-year flood.
Can a non-residential building be floodproofed instead of elevated?
Yes. Section 7-8-10-050(B)(2)(a) allows new non-residential construction to be floodproofed to one foot above the base flood elevation instead of elevated, but a licensed engineer or architect must certify the design and submit a FEMA floodproofing certificate to the public works director.
What happens if I violate Marietta's flood ordinance?
Section 7-8-10-070 lets the public works director issue a stop-work order, withhold a certificate of occupancy, or suspend the permit. Intentional or flagrant violations can bring a municipal court citation with a fine up to $1,000 and up to 60 days in jail per violation, with each day counted separately.

Sources & Official References

Other rules in Marietta

All Marietta rules

Compare Marietta to another location·View the Georgia environmental rules overview

Get notified when Flood Elevation Requirements in Marietta, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.