Marietta, GA Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
City Code § 7-8-14-030
Coverage trigger
5,000 sq ft new impervious surface or 1 acre disturbed
Channel protection
24-hr detention of the 1-yr, 24-hr storm
Overbank protection standard
25-year, 24-hour storm controlled to pre-development rate
Extreme flood standard
100-year, 24-hour storm, no worsened flooding
Design manual
Georgia Stormwater Management Manual

Summary

New development adding 5,000 square feet of impervious surface, or disturbing an acre or more, must meet Marietta's post-development stormwater standards under City Code § 7-8-14-030. Projects must detain the one-year, 24-hour storm, hold 25-year peak discharge to pre-development rates, and avoid worsening flooding in the 100-year, 24-hour storm.

1.New development that creates or adds 5,000 square feet or greater of new impervious surface area or that involves land-disturbing activity of one acre of land or greater; ... E.Stream Channel Protection. Stream channel protection shall be provided by using all of the following three approaches:1.Twenty-four-hour extended detention storage of the one-year, 24-hour return frequency storm event;2.Erosion prevention measures, such as energy dissipation and velocity control; and3.Preservation of any applicable stream buffer.F.Overbank Flood Protection. Downstream overbank flood protection shall be provided by controlling the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour storm event.G.Extreme Flood Protection. Extreme flood protection shall be provided by controlling the 100-year, 24-hour storm event such that flooding is not exacerbated.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 56).

Full Breakdown

Article 7-8-14 applies to new development adding 5,000 square feet or more of impervious surface or disturbing one acre or more, to matching redevelopment thresholds, and to any hotspot commercial or industrial use regardless of size, per § 7-8-14-010(D). Design must follow the Georgia Stormwater Management Manual as directed by the public works director, who serves as administrator. 2-inch rainfall event, with runoff reduction mandatory for plans submitted after December 10, 2020. Subsection E requires stream channel protection through 24-hour extended detention of the one-year, 24-hour storm, erosion-prevention measures, and preservation of any applicable stream buffer.

Subsection F requires overbank flood protection controlling the post-development peak discharge rate for the 25-year, 24-hour storm to the pre-development rate, and subsection G requires the 100-year, 24-hour storm to not be exacerbated. A downstream peak-flow analysis under subsection H must extend to the point where the site represents 10 percent of the total drainage area. Every project must record an inspection and maintenance agreement binding the owner and future successors to keep the stormwater system functioning as designed.

Violations & Fines

Section 7-8-14-050(D) treats any violation of the approved stormwater management plan, or failure to submit as-built drawings or pass final inspection, as a violation of the underlying land-disturbing permit under Article 7-8-12 or building permit under Article 7-4-2, triggering the same notices, stop-work orders and penalties those articles carry, including civil penalties up to $2,500.00 per day. An owner's later failure to maintain the system is treated as a property-maintenance violation under § 7-8-14-070(B), exposing the owner to prosecution, penalties or abatement.

Frequently Asked Questions

What triggers Marietta's stormwater management standards?
Section 7-8-14-010(D) applies the standards to "new development that creates or adds 5,000 square feet or greater of new impervious surface area or that involves land-disturbing activity of one acre of land or greater," plus any hotspot commercial or industrial project regardless of size.
What storm event must a Marietta detention system control?
Section 7-8-14-030(F) requires downstream overbank flood protection by "controlling the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour storm event," while subsection G requires the 100-year, 24-hour storm to not worsen flooding.
What happens if my stormwater system isn't maintained?
Section 7-8-14-070(B) makes an owner's failure to maintain the stormwater management system "as it was originally designed" a violation of the owner's property maintenance obligations, exposing the owner to prosecution, penalties, abatement or emergency measures under the city's general enforcement powers.

Sources & Official References

Other rules in Marietta

All Marietta rules

Compare Marietta to another location·View the Georgia environmental rules overview

Get notified when Stormwater Management in Marietta, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.