Skip to main content
CityRuleLookup

Matanuska-Susitna Borough, AK Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Residential freeboard
Lowest floor 2 ft above base flood elevation
Manufactured homes
Lowest floor 2 ft above BFE, anchored foundation
Nonresidential option
Elevate 2 ft or floodproof, PE certified
AO zone standard
2 ft above depth number, or 4 ft if none
Critical facilities
3 ft above grade or 500-year flood height

Summary

Where base flood elevation data exists, MSB § 17.29.170(A)(1)(a) requires new and substantially improved residential structures in the Matanuska-Susitna Borough's special flood hazard areas to elevate the lowest floor, including any basement, at least two feet above base flood elevation. Nonresidential buildings get an elevate-or-floodproof choice at the same two-foot freeboard.

These county ordinances apply to unincorporated areas of Matanuska-Susitna Borough. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated a minimum of two feet above base flood elevation.

Full Breakdown

The two-foot freeboard in MSB § 17.29.170(A)(1)(a) applies once base flood elevation data has been provided under MSB §§ 17.29.060 or 17.29.130(A)(4). Any fully enclosed area below that elevated lowest floor must either stay empty of habitable use or, per MSB § 17.29.170(A)(1)(b), carry at least two automatic flood-vent openings totaling one square inch of net area per square foot of enclosed space, with the bottom of each opening no higher than one foot above grade.

Nonresidential construction gets a choice under MSB § 17.29.170(A)(2): elevate the lowest floor two feet above base flood elevation like a residence, or floodproof the structure watertight below that level, with a registered professional engineer certifying the design can resist hydrostatic and hydrodynamic loads; floodproofed buildings are flagged for insurance rating one foot below their floodproofed level. Manufactured homes placed outside an existing park, or in a new or expanding park, must sit on a permanent foundation with the lowest floor two feet above base flood elevation and be anchored against flotation and lateral movement (MSB § 17.29.170(A)(3)).

In AO zones, where the FIRM shows only a flood depth rather than a mapped elevation, MSB § 17.29.185 requires the lowest floor at least two feet above the depth number shown, or four feet above the highest adjacent grade if no depth number is given. Critical facilities face the strictest standard: MSB § 17.29.190 elevates their lowest floor three feet above the highest adjacent grade or to the 500-year flood height, whichever is higher, and requires floodproofing and sealing so floodwaters cannot displace toxic substances.

Violations & Fines

Elevating below the two-foot freeboard, or skipping the required engineer's floodproofing certification, is noncompliance under MSB § 17.29.065, which bars construction or alteration in the flood hazard area without full compliance with Chapter 17.29. Enforcement follows MSB Chapter 1.45: a civil penalty up to $1,000 per violation under MSB § 1.45.060(A)(5), with each day the deficient structure exists counted separately under MSB § 1.45.010(C), plus injunctive or restoration relief.

Frequently Asked Questions

How high above base flood elevation must a new house be built in Mat-Su Borough?
MSB § 17.29.170(A)(1)(a) requires the lowest floor, including any basement, of new construction or substantial improvement of a residential structure to sit at least two feet above base flood elevation. Any enclosed space left below that floor needs automatic flood vents or must stay unused, per the same section's opening-ratio standard.
Can a business floodproof instead of elevating?
Yes. MSB § 17.29.170(A)(2) lets nonresidential buildings floodproof to two feet above base flood elevation instead of raising the lowest floor, but a registered professional engineer must certify the design resists hydrostatic and hydrodynamic loads, and flood insurance will rate the building as one foot below its floodproofed level.
Are critical facilities like fire stations held to a higher standard?
Yes. MSB § 17.29.190 requires new critical facilities in the special flood hazard area to elevate their lowest floor three feet above the highest adjacent grade or to the 500-year flood height, whichever is higher, and to floodproof and seal the structure so floodwaters cannot displace toxic materials.

Sources & Official References

Other rules in Matanuska-Susitna Borough

All Matanuska-Susitna Borough rules

Compare Matanuska-Susitna Borough to another location·View the Alaska environmental rules overview

Get notified when Flood Elevation Requirements in Matanuska-Susitna Borough, AK changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.