Palm Beach Gardens, FL Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Trigger for elevation rule
- New, replaced or substantially improved MH
- Existing-park alternative
- Piers 36 inches above grade min. (Sec. 86-119)
- Elevation standard referenced
- FBC Residential R322.2 (Zone A) / R322.3 (Zone V)
- Floodplain administrator
- City engineer (Sec. 86-52)
- Variance insurance disclosure
- Up to $25 per $100 coverage (Sec. 86-90(4))
- Anchoring requirement
- Resist flotation, collapse, lateral movement (Sec. 86-116)
Summary
The City of Palm Beach Gardens requires manufactured and mobile homes that are placed, replaced, or substantially improved in a flood hazard area to be elevated so the bottom of the frame meets the Florida Building Code Residential elevation standard for that flood zone (City Code § 86-118). In an existing manufactured home park that has not suffered flood damage, § 86-119 lets the frame instead rest on reinforced piers at least 36 inches above grade.
Sec. 86-118. - General elevation requirement. Unless subject to the requirements of section 86-119 of this ordinance, all manufactured homes that are placed, replaced, or substantially improved on sites located: (a) outside of a manufactured home park or subdivision; ... or (d) in an existing manufactured home park or subdivision upon which a manufactured home has incurred "substantial damage" as the result of a flood, shall be elevated such that the bottom of the frame is at or above the elevation required, as applicable to the flood hazard area, in the Florida Building Code, Residential Section R322.2 (Zone A) or Section R322.3 (Zone V). ... ... Sec. 86-119. - Elevation requirement for certain existing manufactured home parks and subdivisions. Manufactured homes that are not subject to section 86-118 of this ordinance ... shall be elevated such that either the: ... (2)Bottom of the frame is supported by reinforced piers or other foundation elements of at least equivalent strength that are not less than thirty-six (36) inches in height above grade.
Full Breakdown
The requirement applies whenever a manufactured home is placed, replaced or substantially improved outside a manufactured home park, in a new park, in a park expansion, or in an existing park where a unit already sustained substantial flood damage; in each case Sec. 86-118 requires the bottom of the frame to sit at or above the elevation set by the Florida Building Code, Residential Section R322.2 for Zone A or Section R322.3 for Zone V. Sec. 86-119 carves out an alternative for manufactured homes in pre-existing parks or subdivisions that have not had substantial flood damage: the frame may either meet the same Florida Building Code elevation, or sit on reinforced piers or equivalent foundation elements at least 36 inches above grade.
Related sections in the same Floodplain Management Ordinance (Ch. 86, Art. III, adopted by Ord. No. 15, 2017, effective 9-25-17) round out the standard: anchoring must resist flotation, collapse or lateral movement (Sec. 86-116); enclosed areas below an elevated home must meet the same Florida Building Code Residential sections (Sec. 86-120); and utility equipment serving the home must comply with Florida Building Code Residential Section R322 (Sec. 86-121). The floodplain administrator, who is the city engineer (Sec. 86-52), reviews design certifications and elevation documentation for compliance.
A property owner seeking a variance to build the lowest floor below the required elevation must receive written notice from the floodplain administrator disclosing that flood insurance premiums will rise with the reduced elevation, quoted as up to $25.00 per $100.00 of coverage, before the building board of adjustment and appeals can act (Sec. 86-90(4)).
Violations & Fines
Sec. 86-92 makes any regulated development performed without a permit, in conflict with an issued permit, or not fully compliant a violation of the ordinance, and a manufactured home lacking its required elevation certification is presumed in violation until the documentation is supplied. The floodplain administrator may issue a notice of violation or stop-work order (Sec. 86-93), and continuing work after that notice is punishable under Sec. 86-94. Where no specific penalty applies, the city's general penalty clause (Sec. 1-18) sets a fine up to $500.00, imprisonment up to 60 days, or both, per day of continuing violation.
Frequently Asked Questions
Does Palm Beach Gardens require elevated foundations for manufactured homes in flood zones?
What if my manufactured home is in an older park that never flooded?
Who reviews elevation certifications for manufactured homes in Palm Beach Gardens?
Can I get a variance from the manufactured home elevation requirement?
Sources & Official References
Other rules in Palm Beach Gardens
Florida rules heatmap·Compare Palm Beach Gardens to another location·View the Florida environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Palm Beach County handle flood elevation requirements.