Key Facts

Residential freeboard
1 foot above base flood elevation
Critical facilities
3 feet above BFE or 500-year flood height
Enclosed space venting
1 sq in per sq ft of enclosed area, min. 2 openings
Manufactured homes
Same 1-foot elevation, anchored per PMC 24.20.020(2)
Nonresidential option
Engineer-certified floodproofing to 1 ft above BFE

Summary

New and substantially improved homes in Pasco's mapped flood hazard areas must have their lowest floor, including any basement, built at least one foot above base flood elevation. Manufactured homes and nonresidential buildings face the same one-foot freeboard standard under PMC 24.20.080-.100.

New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated to one foot or more above base flood elevation. Fully enclosed areas below the lowest floor that are subject to flooding are prohibited, or shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of flood waters.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 4837, passed May 4, 2026).

Full Breakdown

080(2)). 100. 090). 130 requires their lowest floor at three feet above base flood elevation, or to the 500-year flood height, whichever is higher, plus floodproofing to keep toxic substances from displacing into floodwaters. 060 still requires the Building Inspector to review permits for reasonable flood safety and warns that failing to elevate at least two feet above the highest adjacent grade can trigger higher federal flood insurance rates.

Violations & Fines

Building a lowest floor below the one-foot freeboard in PMC 24.20.080(1), or enclosing space below it without the required flood-vent openings under PMC 24.20.080(2), is a permit violation the Building Inspector can flag on inspection. Floodproofing a nonresidential building without the engineer's certification required by PMC 24.20.090(3) leaves the owner without a valid alternative to elevation and exposed to higher insurance premiums, since coverage is rated as if the building sat one foot below its actual floodproofed level.

Frequently Asked Questions

How high above base flood elevation must a new Pasco home be built?
At least one foot. PMC 24.20.080(1) requires the lowest floor, including any basement, of new construction or substantial improvement of a residential structure to be elevated one foot or more above base flood elevation.
Can I finish a basement or crawlspace below the elevated floor?
Only if it's engineered to let floodwater in and out automatically. PMC 24.20.080(2) requires at least two vented openings totaling one square inch per square foot of enclosed area, with opening bottoms no higher than one foot above grade.
Does floodproofing let a business skip the elevation requirement?
Yes for nonresidential buildings only. PMC 24.20.090 allows a floodproofed, watertight structure to one foot above base flood elevation instead of elevating, but it must be certified by a registered engineer or architect and insurance is rated as one foot below the certified level.

Sources & Official References

Other rules in Pasco

All Pasco rules

Compare Pasco to another location·View the Washington environmental rules overview

Get notified when Flood Elevation Requirements in Pasco, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.