Southaven, MS Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Community freeboard
- Eighteen inches above base flood elevation
- Lowest floor
- Including basement, at or above freeboard elevation
- Dry floodproofing limit
- Flood velocities of five feet per second or less
- Enclosure limit
- 299 square feet below the lowest floor
- No BFE data
- Forty-two inches above highest adjacent grade
- Elevation certificate
- FEMA Form 81-31 from a Mississippi engineer or surveyor
Summary
In the City of Southaven, Section 6-31 sets the community freeboard at eighteen inches: new or substantially improved residential and non-residential buildings must have the lowest floor, including basement, elevated no lower than 18 inches above the base flood elevation. Non-residential buildings in A zones can floodproof instead, with engineer certification.
(1)Residential construction. New construction or substantial improvement of any residential building (or manufactured home) shall have the lowest floor, including basement, elevated no lower than eighteen (18) inches above the base flood elevation, (the community freeboard). ... (2)Non-residential construction. New construction or substantial improvement of any commercial, industrial, or nonresidential building (or manufactured home) shall have the lowest floor, including basement elevated to no lower than eighteen (18) inches above the level of the base flood elevation (the community freeboard). Buildings located in all A zones may, together with attendant utility and sanitary facilities, be floodproofed in lieu of being elevated provided that all areas of the building below the BFE (plus the minimum eighteen-inch community free board) are water tight with walls substantially impermeable to the passage of water
Full Breakdown
Section 6-31 applies in special flood hazard areas designated on the community's FIRM where base flood elevation data have been provided, excluding the community flood hazard areas and the Coastal AE Zone. Subsection (1) covers residential construction: the lowest floor, including basement, is elevated no lower than eighteen inches above the base flood elevation, which the code calls the community freeboard. Subsection (2) applies the same eighteen inches to commercial, industrial and nonresidential buildings and to manufactured homes.
Non-residential buildings in all A zones can be floodproofed instead of elevated, but every area below the base flood elevation plus the minimum eighteen-inch community freeboard must be water tight with walls substantially impermeable to the passage of water. Dry floodproofing is allowed only where flood velocities are less than or equal to five feet per second. A registered professional engineer or architect certifies the design, and the design professional supplies a flood emergency operation plan and an inspection and maintenance plan.
The definitions in Section 6-6 tie the terms together: the flood protection elevation is the base flood elevation plus the community freeboard. Section 6-21 requires the elevation certificate on FEMA Form 81-31 and states that floodproofing must be eighteen inches above the base flood elevation. It also requires lots removed from the special flood hazard area by a letter of map revision based on fill to meet the freeboard elevation when the top of fill is below it.
Enclosures below an elevated building are limited under subsection (4) to 299 square feet, used only for parking, building access and storage, with at least two openings on different sides, one square inch of net opening per square foot of enclosed area, and opening bottoms no higher than one foot above interior grade. Manufactured homes take the eighteen inches too under subsection (5). Where no base flood elevation data exist, Section 6-32(4) requires the lowest floor at least forty-two inches above the highest adjacent grade.
Violations & Fines
Section 6-19 makes a violation of Title VI a misdemeanor punishable, on conviction, by a fine of not more than $500.00 or imprisonment for not more than thirty days, or both, plus costs, with each day a separate offense. Failure to submit the lowest floor elevation survey or to correct deficiencies found on review is cause for a stop-work order under Section 6-21, and work done before certification proceeds at the permit holder's risk.
Frequently Asked Questions
How high above the base flood elevation must a Southaven home be built?
Can a Southaven commercial building floodproof instead of elevating?
What is the rule where no base flood elevation has been published?
Is there a limit on enclosed space below the lowest floor?
Sources & Official References
Other rules in Southaven
Compare Southaven to another location·View the Mississippi environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.