Southaven, MS Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Southaven, MS, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required
- Before any development in special or community flood hazard areas
- Flood maps
- FEMA Flood Insurance Study for DeSoto County, May 5, 2014
- Administrator
- The city engineer
- Stream buffer
- Five times stream width or twenty feet, whichever is greater
- Maximum penalty
- $500.00 fine or thirty days, or both
- Floodway rule
- No encroachments, including fill or new construction
Summary
In the City of Southaven, Section 6-12 requires a development permit before any development activities begin in identified special flood hazard areas and community flood hazard areas. The maps are the FEMA Flood Insurance Study for DeSoto County dated May 5, 2014, and the city engineer serves as floodplain administrator.
The areas of special flood hazard identified by the Federal Emergency Management Agency in the Flood Insurance Study for DeSoto County and Incorporated Areas, dated May 5, 2014, with the accompanying Flood Insurance Rate Maps (FIRM) panels numbers 55H, 56G, 57G, 59G, 70H, 76G, 77G, 78H, 79H, 81H, 83H, 90H, 91H, and 93H and other supporting data, are adopted by reference and declared to be a part of this title. ... A development permit shall be required in conformance with the provision of this title prior to the commencement of any development activities in identified special flood hazard areas and community flood hazard areas.
Full Breakdown
Title VI of the Southaven Code adopts the areas of special flood hazard identified by the Federal Emergency Management Agency in the Flood Insurance Study for DeSoto County and Incorporated Areas, dated May 5, 2014, with the accompanying Flood Insurance Rate Maps. Section 6-11 places the study and maps on file at the city engineer's office. Section 6-16 adds community flood hazard areas: land outside the FEMA studied areas along blue line streams, defined by a buffer of five times the width of the stream at the top of the bank or twenty feet each side from the top of the bank, whichever is greater.
The Mayor and Board of Aldermen appointed the city engineer as floodplain administrator under Section 6-20. Section 6-21 requires the application on forms the administrator furnishes, showing the nature, location, dimensions and elevations of the area, structures, fill, storage and drainage facilities. The proposed lowest floor elevation, including basement, goes on a FEMA Form 81-31 elevation certificate prepared by a State of Mississippi registered engineer or surveyor. No permit issues to any mobile, modular or permanently constructed residence unless the owner obtains a Notice of Intent from the Mississippi State Health Department.
Inspection follows the build. When the lowest floor is placed and before framing continues, the permit holder submits an elevation certification. Failure to submit it or to correct deficiencies is cause for a stop-work order. Section 6-22 sets three inspections: the first at the base flood elevation reference mark, the second at the structure's footprint before the slab is poured or the lowest floor is set on an elevated foundation, and the final on completion with the finished construction elevation certificate.
Section 6-30(16) prohibits storage or processing of hazardous, flammable or explosive materials within special flood hazard areas, including identified floodways. Section 6-31(6) prohibits encroachments in floodways, including fill, new construction and substantial improvements. Variances go to the Mayor and Board of Aldermen under Section 6-40, and Section 6-43(f) bars variances issued after the fact.
Violations & Fines
Section 6-19 makes a violation of Title VI, including a violation of variance conditions, a misdemeanor. On conviction the fine is not more than $500.00 or imprisonment for not more than thirty days, or both, plus all costs and expenses of the case. Each act of violation and each day a violation continues is a separate offense. The floodplain administrator also issues stop-work orders under Section 6-22(2) and can revoke a permit for false statements or nonconforming work.
Frequently Asked Questions
When does Southaven require a floodplain development permit?
What is a community flood hazard area in Southaven?
What inspections does the city make on a flood zone project?
Who hears appeals and variance requests on flood rules?
Sources & Official References
Other rules in Southaven
Compare Southaven to another location·View the Mississippi environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.