Skip to main content
CityRuleLookup

Wake County, NC Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Elevation standard
Lowest floor at/above RFPE
RFPE equals
Base (100-year) flood elevation
Plan review
Dept. of Environmental Services
Applies to
New construction + major repairs

Summary

New homes in Wake County's mapped flood hazard areas must have their lowest floor, including any basement, built at or above the regulatory flood protection elevation.

City-specific rules exist: Apex, Cary, and Raleigh have their own flood elevation requirements rules that differ from Wake County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

14-18-3In all areas of special flood hazard:(A)New residential construction or major repairs of any residential structure must have the lowest floor, including basement, elevated to or above the regulatory flood protection elevation (RFPE);(B)New nonresidential construction or major repairs of any commercial, industrial or other nonresidential structure must have the lowest floor, including basement, elevated to or above the level of the regulatory flood protection elevation (RFPE);

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Unified Development Ordinance: Supplement 9).

Full Breakdown

In areas of special flood hazard, Wake County's flood damage prevention standards require new residential construction and major repairs to elevate the lowest floor, including any basement, to or above the Regulatory Flood Protection Elevation, or RFPE (§14-18-3(A)). The same floor-elevation rule applies to nonresidential structures, which may floodproof instead if certified by a licensed engineer or architect (§14-18-3(B)). RFPE is defined as the base 100-year flood elevation (§14-12). A building permit for these areas can't issue until Environmental Services reviews the plans (§14-14-1).

Violations & Fines

Building below the required elevation, or without Department of Environmental Services plan review, blocks issuance of a Certificate of Compliance/Occupancy and exposes the owner to UDO Article 20 enforcement, including permit denial and a $100/day civil penalty.

Frequently Asked Questions

How high must a new home be built in a Wake County flood zone?
The lowest floor, including any basement, must sit at or above the Regulatory Flood Protection Elevation, the base 100-year flood elevation, under §14-18-3(A).
Does Wake County require extra freeboard above the base flood elevation?
The code defines RFPE as the base flood elevation itself (§14-12); this general provision doesn't add a separate freeboard cushion.

Sources & Official References

Other rules in Wake County

All Wake County rules

Compare Wake County to another location·View the North Carolina environmental rules overview

Get notified when Flood Elevation Requirements in Wake County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Cities Across Wake County