Hudson, NH Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Hudson, NH, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit issuer
- Town Engineer
- Applies to
- FEMA special flood hazard areas
- Residential requirement
- lowest floor at/above base flood elevation
- FIRM date
- September 25, 2009, as amended
- Appeal body
- Joint ZBA/Building Board of Appeals
- Adopted
- 1987, Ord. No. O87-5
Summary
The Town of Hudson, New Hampshire requires a floodplain permit from the Town Engineer for any development in a FEMA-designated special flood hazard area, and new or substantially improved structures must have their lowest floor elevated to or above the base flood elevation.
§ 218-3. Permit required. ... All proposed development in any special flood hazard areas shall require a floodplain permit, to be issued by the Town Engineer. § 218-4. Duties of Town Engineer. ... The Town Engineer's base flood elevation determination will be used as criteria for requiring in Zones A and AE that: ... All new construction and substantial improvements of residential structures have the lowest floor, including the basement, elevated to or above the base flood elevation.
Full Breakdown
Hudson's Flood Damage Prevention chapter, adopted in 1987 by Ord. No. O87-5, makes the Town a participating community in the National Flood Insurance Program under § 218-1, which applies to lands designated as special flood hazard areas on FEMA's Flood Insurance Rate Map for Hillsborough County, dated September 25, 2009, as amended. The chapter overlays and supplements Hudson's Zoning Ordinance, and where the two conflict, the more restrictive standard controls. Section 218-3 requires a floodplain permit, issued by the Town Engineer, for all proposed development in a special flood hazard area.
Under § 218-4, the Town Engineer determines the base flood elevation for each site, using FEMA's Flood Insurance Study data in Zone AE or, in Zone A, the best available data or at least two feet above the highest adjacent grade if no data exists. Section 218-4E then requires new construction and substantial improvements of residential structures to have their lowest floor, including any basement, elevated to or above that base flood elevation; nonresidential structures must either meet the same elevation or be certified watertight and floodproofed by a licensed engineer or architect.
Manufactured homes placed in a flood hazard area must be elevated on a permanent foundation and anchored against flotation and lateral movement. Appeals and variance requests go to a Joint Committee of the Zoning Board of Adjustment and Building Board of Appeals under § 218-8, which weighs flood danger, alternative sites and community impact before granting relief, with further appeal available to Superior Court.
Violations & Fines
Developing in a special flood hazard area without the § 218-3 floodplain permit, or building below the required base flood elevation set under § 218-4, violates the chapter; the Town Engineer administers and enforces it as the designated enforcing agent under § 218-8B. An owner denied a permit or aggrieved by an elevation determination may seek a variance from the Joint Committee of the Zoning Board of Adjustment and Building Board of Appeals before pursuing a Superior Court appeal.
Frequently Asked Questions
Do I need a permit to build in a Hudson, NH flood zone?
How high must a new house be built in a Hudson flood zone?
Can I appeal a Hudson floodplain permit decision?
Sources & Official References
Other rules in Hudson
Compare Hudson to another location·View the New Hampshire environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Zones in Nearby Cities
How other cities in this county handle flood zones.