Key Facts
- Governing section
- Bannock County Code § 17.52.540
- Core standard
- No increase over natural peak flow rate
- Subdivision design rules
- § 16.28.100 sets detention basin standards
- Max basin depth
- 5 feet unless ground justifies more
- Maintenance bond
- 110% of cost, held 5 years
- First infraction fine
- $50, then $100 for repeat
- Misdemeanor threshold
- After 2 prior convictions in 24 months
Summary
In unincorporated Bannock County, new development cannot increase peak stormwater flow onto downstream neighbors beyond what the land would have produced in its natural, undeveloped state. The county engineer or building official inspects drainage facilities during construction, and noncompliant projects face suspended building permits or enforcement under the zoning code's penalty section.
A.On-Site Detention and Limitation of Stormwater Runoff. No development shall cause downstream property owners, watercourses, channels or conduits to receive stormwater runoff from proposed developments at a higher peak flow rate than would have resulted from the same storm event occurring over the site of the proposed development with the land in its natural, undeveloped condition.B.Inspection of Facilities. The county engineer and/or building official may inspect drainage facilities while under construction. If facilities are not constructed according to approved plans, the county has the explicit authority to compel compliance and require correction, including suspension of building permits, or by enforcement of this title (Section 17.56.030).
Full Breakdown
Bannock County Code § 17.52.540 sets the county's core stormwater standard for development in the unincorporated area: no project may cause downstream property owners, watercourses, channels or conduits to receive runoff at a higher peak flow rate than the same storm event would have produced with the site left in its natural, undeveloped condition. The county engineer and/or building official may inspect drainage facilities while they are under construction, and if the work does not match the approved plans, the county can compel correction, suspend building permits, or pursue enforcement under Section 17.56.030.
A companion provision in the subdivision ordinance, Bannock County Code § 16.28.100, applies the same peak-flow limitation to platted subdivisions and adds design detail: developers must provide on-site or off-site detention for the excess runoff created by new impervious surface, compacted or filled soil, cleared vegetation, or altered drainage ways; detention basins are capped at a maximum planned depth of five feet unless natural ground conditions justify more; outlet structures must limit discharge to the site's natural flow; and an emergency spillway is required unless inflow is otherwise controlled.
Under that same subdivision chapter the developer posts a maintenance bond equal to 110 percent of the facility's development and maintenance cost, held for five years, and remains responsible for upkeep until 80 percent of the development is built and occupied or five years have passed, whichever is longer, before the facilities can transfer to a homeowners' association. Wetlands, riparian buffers within 100 feet of a water body, and steep-slope areas over 30 percent draw additional restrictions under the adjoining natural-features standards in the same chapters.
Violations & Fines
Stormwater and related zoning-title violations in unincorporated Bannock County are enforced by the planning director as an infraction in the first instance under Bannock County Code § 17.56.030: a first violation carries a fixed $50 fine, a subsequent violation $100, and each day a violation continues counts as a separate offense. Once a person has two prior convictions under the title within the preceding twenty-four months, a further violation becomes a misdemeanor punishable by up to six months in the county jail, a fine of up to $300, or both. The county may also suspend building permits or pursue civil enforcement to compel drainage facilities to match approved plans.
Frequently Asked Questions
Does Bannock County limit how much stormwater a new development can send downstream?
Who inspects stormwater detention facilities during construction?
How deep can a stormwater detention basin be in a Bannock County subdivision?
What happens if a developer ignores a stormwater violation notice?
Sources & Official References
Other rules in Bannock County
Compare Bannock County to another location·View the Idaho environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.