Skip to main content
CityRuleLookup

Bend, OR Environmental Rules: Stormwater Management (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Triggers review
5,000+ sq ft impervious area or 1+ acre disturbed
Design storm
25-year, 24-hour NRCS Type I event
Off-site overflow standard
100-year, 24-hour storm safe passage
Design manual
Central Oregon Stormwater Manual (COSM)
Maintenance agreement
recorded with Deschutes County Clerk
Penalty
Class A civil infraction, BC 16.05.050

Summary

In the City of Bend, new development or redevelopment that creates 5,000 square feet or more of new impervious surface, or disturbs one acre or more, must submit a drainage plan under Bend Code § 16.15.010 and design its stormwater facilities to the 25-year, 24-hour design storm event required by BC 16.15.040.

Violation of any provision of this title or of any permit or order issued under this title is a Class A civil infraction. Each day that a violation remains uncured in effect is a separate violation. ... 7. ... All stormwater will be contained within designed facilities as appropriate. Stormwater facilities shall be designed to provide service for the National Resource Conservation Service (NRCS) Type I 24-hour storm event, for a 25-year, 24-hour design storm, with a safe overflow path that: ... 4. ... Stormwater drainage in excess of the predevelopment rates or volumes shall be retained on the lot of origin by meeting the current 25-year, 24-hour design storm event, subject to 100-year safe passage requirements in COSM, and not trespass onto the public right-of-way or private property except as provided below:

Full Breakdown

030), covering projects that create or replace 5,000 square feet or more of impervious area, disturb one acre or more, add a manufactured home park, or involve commercial, institutional or multifamily building permits. 010(B)(7)). 040 requires that runoff above pre-development rates stay on the lot of origin unless the City finds on-site retention would threaten public safety, and it bans directing runoff onto public right-of-way or a neighboring lot without City-approved capacity. 040). 050). 060).

Violations & Fines

Violating Title 16's stormwater design or maintenance-agreement requirements is a Class A civil infraction under BC 16.05.050(B)(2)(a), with each day a violation continues charged as a separate offense. Before pursuing a civil infraction the City may withhold permit inspections or approvals, issue a written notice of violation, enter a voluntary compliance agreement, or issue a cease-and-desist or emergency suspension order, and it can seek injunctive relief and recover attorneys' fees and cleanup costs through the Circuit Court for Deschutes County.

Frequently Asked Questions

When does a Bend project need a stormwater drainage submittal?
When it creates or replaces 5,000 square feet or more of impervious surface, disturbs one acre or more, involves a manufactured home park, or is a commercial, institutional or multifamily building permit or site plan, per BC 16.15.010(A). The plan is reviewed and approved by the City under BC 16.15.030.
What design storm must Bend stormwater facilities handle?
Facilities must serve the NRCS Type I 24-hour, 25-year design storm and provide a safe overflow path, with options including containing the 100-year, 24-hour storm on site or routing it off-site under a formal agreement with affected landowners, per BC 16.15.010(B)(7).
Who maintains stormwater facilities after a Bend project is built?
The property owner, under a recorded Stormwater System Maintenance Agreement required by BC 16.15.050 for projects needing structural BMPs; the agreement runs with the land and is recorded with the Deschutes County Clerk.
What is the penalty for violating Bend's stormwater rules?
A Class A civil infraction under BC 16.05.050, with each day a violation continues counted as a separate offense, on top of remedies like withheld permits, cease-and-desist orders, or a Circuit Court injunction.

Sources & Official References

Other rules in Bend

All Bend rules

Compare Bend to another location·View the Oregon environmental rules overview

Get notified when Stormwater Management in Bend, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.