Hamden, CT Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing section
- Hamden Code of Ordinances § 51.30
- Sewage into storm sewer
- Prohibited outright
- Storm water into sanitary sewer
- Prohibited outright
- Outlet approval authority
- Town Engineer
- Industrial water approval
- Engineer plus State Commissioner sign-off
- Penalty
- $25 to $100 per day, per offense
Summary
Hamden's sewer ordinance keeps storm water out of the sanitary system and sewage out of storm drains. Section 51.30 bars anyone from discharging sewage into a storm sewer, and bars discharging storm water, surface water, groundwater, roof runoff, subsurface drainage, or unpolluted cooling water into a sanitary sewer. Storm water must reach a sewer built for that purpose or a natural outlet the Town Engineer approves.
(A) No person shall directly or indirectly discharge or cause to be discharged any sewage into any storm sewer. (B) No person shall discharge or cause to be discharged any stormwater, surface water, groundwater, roof runoff, subsurface drainage, uncontaminated cooling water, or unpolluted industrial process water into any sanitary sewer. (C) Storm water and all other unpolluted drainage shall be discharged to such sewers as are specifically designed as storm sewers or to a natural outlet approved by the Engineer. Industrial cooling water or unpolluted process water may be discharged on specific written approval of the Engineer and the State Commissioner of Environmental Protection, to a storm sewer or natural outlet.
Full Breakdown
Section 51.30 of the Hamden Code of Ordinances, Storm Water and Unpolluted Drainage, splits the town's sewer network into two lanes that cannot mix. Paragraph (A) forbids discharging sewage, directly or indirectly, into any storm sewer. Paragraph (B) forbids discharging storm water, surface water, groundwater, roof runoff, subsurface drainage, uncontaminated cooling water, or unpolluted industrial process water into any sanitary sewer. Paragraph (C) requires that storm water and other unpolluted drainage go to sewers specifically designed as storm sewers, or to a natural outlet the Town Engineer signs off on.
Industrial cooling water or unpolluted process water can reach a storm sewer or natural outlet only with specific written approval from the Town Engineer and the State Commissioner of Environmental Protection. The Town Engineer is the town's own engineer or an authorized deputy, agent, or representative designated by the Mayor with the Legislative Council's consent, per the chapter's definitions. The rule sits inside the same chapter that regulates building sewers, connections, and treatment plant discharges, so a property owner running a downspout or sump pump into the sanitary line, or a contractor tying storm drainage into the wrong pipe, is violating this section rather than a separate stormwater code. Hamden has no free-standing land use stormwater management ordinance in this code; drainage control here is a sewer-separation rule enforced through the Sewers chapter.
Violations & Fines
Section 51.99(A) makes continued violation of any provision in Sections 51.01 through 51.49, which includes Section 51.30, punishable by a fine of not less than $25 nor more than $100 for each offense once the time limit in a notice issued under Section 51.49 has expired. Each day the violation continues counts as a separate offense, so daily fines can accumulate quickly on an uncorrected illegal storm/sanitary cross-connection.
Frequently Asked Questions
Can I run my roof downspout into Hamden's sanitary sewer?
Where is storm water supposed to go under Hamden's ordinance?
What does Hamden fine for a stormwater or sanitary sewer violation?
Who approves a natural outlet for storm water in Hamden?
Sources & Official References
Other rules in Hamden
Compare Hamden to another location·View the Connecticut environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.