Lauderhill, FL Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Waterway creation permit
Required from the City Engineer, Sec. 5.3.2
Design plans required
Four sets of engineer-prepared plans, Sec. 5.3.2.B
Canal maintenance penalty
$25 per day, capped at $2,500
Compliance window
90 days after City Manager's notice
Fill slope limit
Four horizontal to one vertical maximum

Summary

Section 5.3 of Lauderhill's Land Development Regulations requires a City Engineer permit before creating any waterway not controlled by the South Florida Water Management District and makes all development meet Broward County and SFWMD stormwater runoff standards to prevent flooding and pollution.

Sec. 5.3. - Surface water management regulations. ... 5.3.2.Permit required.A.No waterway, except those which are controlled and maintained by the South Florida Water Management District, shall be created unless a permit for same has been first approved in writing by the City Engineer. ... B.All development shall meet the requirements of Broward County Water Resources Management Division and South Florida Water Management District to control stormwater runoff, for the purpose of preventing flooding in adjacent areas, or pollution of water bodies. ... 5.3.4.Waterway use.A.No person, firm or corporation shall obstruct any public waterway within the City of Lauderhill by any means whatever.

Full Breakdown

Section 5.3.1 requires written conceptual approval from the applicable federal, state, and county agencies, including the U.S. Army Corps of Engineers, the Florida Department of Environmental Protection, and the Broward County Development and Environmental Regulation Division, for any development order altering canals, dams, levees, spillways, culverts, bridges, reservoirs, pumping stations, or similar water management works. Section 5.3.2.A bars creation of any waterway, except those controlled by the South Florida Water Management District, without a permit first approved in writing by the City Engineer; Section 5.3.2.B requires the application by letter or prescribed form with four sets of engineer-prepared plans showing the waterway's location and cross-sections, and Section 5.3.2.C requires the City Engineer to inspect construction and requires as-built cross-sections every 100 feet upon completion.

Section 5.3.3.B requires all development to meet Broward County Water Resources Management Division and South Florida Water Management District requirements to control stormwater runoff and prevent flooding of adjacent areas or pollution of water bodies. Fill deposited under Section 5.3.3.C cannot create a shore slope steeper than four horizontal to one vertical above two feet below the design water elevation, and Section 5.3.3.D and E require retained or replaced natural vegetation and silt screens on cleared waterfront lots to control erosion. Section 5.3.5.A requires property owners abutting a drainage canal to remove trees, shrubs, structures, docks, and fences that block right-of-way access or canal maintenance, with 90 days to comply after notice from the City Manager under Section 5.3.5.B.

Violations & Fines

Section 5.3.4.A prohibits obstructing any public waterway within the City by any means, and Section 5.3.4.B bars allowing material to wash, run, or flow from a property so as to obstruct or pollute a waterway. Under Section 5.3.5.C, a property owner who fails to comply with canal maintenance requirements after notice is liable for a penalty of twenty-five dollars ($25.00) per day of noncompliance, capped at two thousand five hundred dollars ($2,500.00).

Frequently Asked Questions

Do I need a permit to alter a waterway in Lauderhill?
Yes. Section 5.3.2.A requires written approval from the City Engineer before creating any waterway not controlled by the South Florida Water Management District, and Section 5.3.2.B requires an application with four sets of engineer-prepared plans.
What stormwater standards apply to new development?
Section 5.3.3.B requires all development to meet Broward County Water Resources Management Division and South Florida Water Management District requirements to control stormwater runoff and prevent flooding of adjacent areas or pollution of waterways.
What happens if I don't maintain the canal behind my property?
Section 5.3.5.B gives owners 90 days after the City Manager's notice to clear obstructions from a drainage canal. Section 5.3.5.C imposes a $25-per-day penalty for noncompliance, capped at $2,500.

Sources & Official References

Other rules in Lauderhill

All Lauderhill rules

Florida rules heatmap·Compare Lauderhill to another location·View the Florida environmental rules overview

Get notified when Stormwater Management in Lauderhill, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Broward County handle stormwater management.

Hollywood, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions
Miramar, FL
Some Restrictions
Coral Springs, FL
Some Restrictions
Fort Lauderdale, FL
Some Restrictions
Pembroke Pines, FL
Significant Restrictions