Portage County, WI Environmental Rules: Stormwater Management (2026)
Key Facts
- Trigger
- Accessory building over 2,000 sq ft
- Reviewing office
- Planning and Zoning Department
- PD district design storm
- 25-year storm event
- Permit-without-plan fine
- $100.00 ($263.50 total)
Summary
Unincorporated Portage County requires a stormwater control plan before a Zoning Permit issues for any accessory building, or combined accessory buildings, exceeding 2,000 square feet. The Planning and Zoning Department reviews and approves the plan, and can also require added screening or setbacks for large accessory structures.
4.Accessory buildings, including private garages and buildings clearly incidental to the residential use of the property, provided, however, that no accessory building may be used as a separate dwelling unit. ... b.Any single accessory building or cumulative total exceeding 2,000 square feet will require submittal of a stormwater control plan to the Planning and Zoning Department for review and approval before a Zoning Permit is issued.
Full Breakdown
Sec. 7.1.2(1)(b)4.b of the Portage County Zoning ordinance requires that any single accessory building, or cumulative total of accessory buildings, exceeding 2,000 square feet come with a stormwater control plan submitted to the Planning and Zoning Department for review and approval before a Zoning Permit is issued. This threshold sits inside the county's broader accessory-building standard for the R2 Single Family Residence District, which caps total accessory square footage at 2,800 square feet on lots under two acres and 3,200 square feet on larger lots.
Beyond the 2,000-square-foot stormwater trigger, the Planning and Zoning Department may also require increased screening or larger setbacks for individual accessory buildings of that size. In Planned Development Districts, the county applies a more detailed construction-site erosion and stormwater standard: an approved stormwater control plan must be designed to control runoff from a 25-year storm event, capturing all runoff from impervious surfaces, using standards from the Wisconsin Construction Site Best Management Practices handbook and at least six inches of vegetated topsoil. A zoning permit will not issue for a covered project until the Planning and Zoning Department has reviewed and approved the required plan, giving the county a direct check on runoff before large accessory structures or planned developments are built.
Violations & Fines
Building an accessory structure over 2,000 square feet, or a planned development, without an approved stormwater control plan on file blocks issuance of the required Zoning Permit; building without that permit is a separate violation carrying a $100.00 forfeiture plus court costs and surcharges, $263.50 total, under Sec. 7.1.6(2)(a)2.a. of the county's citation schedule.
Frequently Asked Questions
When does Portage County require a stormwater plan for a shed?
Who reviews stormwater control plans in Portage County?
What if I build a large shed without a stormwater plan?
Sources & Official References
Other rules in Portage County
Compare Portage County to another location·View the Wisconsin environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.