Story County, IA Environmental Rules: Stormwater Management (2026)
Key Facts
- Trigger 1
- Disturbs 1 acre or more of land
- Trigger 2
- Splits land into more than 4 lots
- Water quality design storm
- 1.25 inch rainfall depth
- Channel protection
- 24-hour detention, 1-year 24-hour storm
- Plan must be signed by
- Iowa-licensed professional engineer
- First offense penalty
- Up to $750 civil penalty
- Repeat offense penalty
- Up to $1,000 per violation
Summary
Unincorporated Story County requires a Stormwater Management Plan before construction on any development that disturbs one acre or more, or that splits land into more than four lots. The plan must meet numeric water-quality, channel-protection and peak-runoff criteria under Story County Code of Ordinances § 88.05(4) and be certified by an Iowa-licensed professional engineer before Planning and Development will issue permits.
Post-Construction Stormwater Management. Stormwater runoff increases nonpoint source pollution, flooding, siltation, stream temperatures, and streambank erosion. ... Development that meets any of the following thresholds shall be required to submit a Stormwater Management Plan, in addition to other applicable development permit applications, prior to commencing development activities: ... Development, including common development, that disturbs an area one-acre or greater in size. ... Development that will result in the division of land into more than four development lots. ... The site shall be designed to manage the water quality volume of a rainfall depth of 1.25 inches and to manage corresponding recharge volume through infiltration practices.
Full Breakdown
Section 88.05(4) of the Land Development Regulations sets post-construction stormwater standards for unincorporated Story County. Two triggers require a Stormwater Management Plan: any development, including common development, disturbing one acre or more, and any development that divides land into more than four development lots. Once triggered, the plan must be signed and certified by an Iowa-licensed professional engineer and show pre- and post-development land use, soils, topography at two-foot contours, watercourses, wetlands, floodplains, wells and septic systems.
The county sets three numeric design criteria, calculated using the Iowa Stormwater Management Manual: the site must manage the water-quality volume produced by a 1.25-inch rainfall through infiltration; provide 24 hours of extended detention for the channel-protection volume of the 1-year, 24-hour storm; and limit post-development peak runoff for storms from the 5-year through the 100-year, 24-hour event to the lesser of pre-settlement or existing-condition rates. Low Impact Development practices are required wherever feasible.
Exemptions apply to agricultural land (except where Iowa Code § 335.2 requires otherwise), county, state or federal road maintenance and construction, and maintenance of development that predates the ordinance so long as the footprint doesn't grow. Where infiltration is infeasible, such as poorly draining Group D soils or high groundwater, the site must instead provide water-quality treatment through alternative BMPs, retention ponds, sand filters, vegetated swales, targeting an 80 percent reduction in total suspended solids. Plans are reviewed by the Planning and Development Department alongside the underlying zoning, grading, subdivision or commercial site-plan application.
Violations & Fines
Stormwater violations are enforced as Land Development Regulation infractions under Chapter 93. Planning and Development first issues a written Notice of Violation giving 30 days to correct the deficiency or submit a compliance schedule; violators may appeal to the Board of Adjustment within 30 days. Uncorrected violations draw a County infraction citation carrying a civil penalty of up to $750 for a first offense and up to $1,000 for each repeat offense, with each day of continued violation counted separately.
Frequently Asked Questions
When does a project in unincorporated Story County need a Stormwater Management Plan?
Who must design and sign the Stormwater Management Plan?
Is farmland exempt from Story County's stormwater rules?
What happens if a developer skips the required plan?
Sources & Official References
Other rules in Story County
Compare Story County to another location·View the Iowa environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.