Skip to main content
CityRuleLookup

Environmental Rules in Iowa (2026)

48 rules on the books across Iowa, 10 cities and counties. Select a rule to read the full details.

Severity: Few Restrictions · Light Restrictions · Some Restrictions · Significant Restrictions · Heavy Restrictions

Stormwater Management

Requirements for managing rainwater runoff on your property, including retention basins, permeable surfaces, and drainage plans.

Iowa: statewide

StatewideHeavy Restrictions

Iowa Code chapter 455B authorizes the DNR to administer NPDES stormwater permits statewide. Construction sites…

Read full rule →

Black Hawk County

Some Restrictions

New subdivisions in unincorporated Black Hawk County must provide adequate storm sewers and inlets, protect natural…

Read full rule →

Cedar Rapids

Some Restrictions

Cedar Rapids requires an approved Stormwater Management Plan before any development, with on-site detention mandatory…

Read full rule →

Davenport

Some Restrictions

Davenport regulates stormwater under Municipal Code Chapter 13.34, administered by the Public Works Natural Resources…

Read full rule →

Des Moines

Some Restrictions

Des Moines requires a stormwater management plan for any development adding more than 10,000 square feet of new…

Read full rule →

Iowa City

Some Restrictions

Iowa City runs every developed parcel through a citywide stormwater utility. Owners pay a monthly charge based on an…

Read full rule →

Johnson County

Some Restrictions

Unincorporated Johnson County requires an adequate stormwater management plan before approving most subdivisions, site…

Read full rule →

Linn County

Some Restrictions

Unincorporated Linn County requires a stormwater pollution prevention plan for major subdivisions and any…

Read full rule →

Polk County

Some Restrictions

Unincorporated Polk County requires stormwater detention facilities on developments that cannot directly discharge…

Read full rule →

Sioux City

Some Restrictions

Sioux City requires storm water management review for construction creating 5,000 or more square feet of impervious…

Read full rule →

Story County

Some Restrictions

Unincorporated Story County requires a Stormwater Management Plan before construction on any development that disturbs…

Read full rule →

Erosion Control

Rules to prevent soil erosion during construction and landscaping, including required sediment barriers and ground cover standards.

Iowa: statewide

StatewideSome Restrictions

Iowa Code Chapter 161A makes every landowner statewide responsible for establishing and maintaining erosion control…

Read full rule →

Iowa City

Significant Restrictions

Iowa City requires a construction site runoff (CSR) permit, on top of any state NPDES permit, for earth-disturbing work…

Read full rule →

Cedar Rapids

Some Restrictions

Cedar Rapids requires an erosion control permit before any land-disturbing activity in the city: a major permit for…

Read full rule →

Davenport

Some Restrictions

Davenport requires erosion and sediment control on construction sites, tied to its stormwater code (Chapter 13.34) and…

Read full rule →

Des Moines

Some Restrictions

Des Moines requires a city engineer grading permit before you strip, excavate, fill, or install drainage pipe on most…

Read full rule →

Johnson County

Some Restrictions

Johnson County requires an approved soil erosion and sediment control plan before the Zoning Administrator issues a…

Read full rule →

Linn County

Some Restrictions

Linn County requires a stormwater pollution prevention plan for major subdivisions and other land-disturbing permits…

Read full rule →

Polk County

Some Restrictions

Unincorporated Polk County requires a Grading Permit for land-disturbing work exceeding three feet of fill, five feet…

Read full rule →

Sioux City

Some Restrictions

Sioux City requires a grading permit before moving more than 50 cubic yards of material anywhere in the city, with the…

Read full rule →

Story County

Some Restrictions

Any development or land-disturbing activity in unincorporated Story County must control erosion and sedimentation under…

Read full rule →

Flood Zones

Building requirements for properties in FEMA flood zones, including elevation standards, flood insurance mandates, and construction limits.

Iowa: statewide

StatewideHeavy Restrictions

Iowa Code 455B and Iowa Admin Code 567 chapters 70 through 72 require state DNR approval for floodplain or floodway…

Read full rule →

Davenport

Heavy Restrictions

Davenport enforces floodplain rules under Municipal Code Chapter 15.44 for FEMA Special Flood Hazard Areas along the…

Read full rule →

Black Hawk County

Significant Restrictions

Unincorporated Black Hawk County splits its floodplain into four overlay sub-districts, Floodway, Floodway Fringe…

Read full rule →

Cedar Rapids

Significant Restrictions

Cedar Rapids requires a Floodplain Development Permit from the city's Floodplain Administrator before any construction…

Read full rule →

Des Moines

Significant Restrictions

Des Moines requires a certificate of compliance before any construction, fill, or grading in a mapped floodplain, with…

Read full rule →

Iowa City

Significant Restrictions

Iowa City requires a floodplain development permit from the building official before any development begins on land in…

Read full rule →

Johnson County

Significant Restrictions

Any development in a mapped floodplain in unincorporated Johnson County, including placing a factory-built home, needs…

Read full rule →

Linn County

Significant Restrictions

Any manmade change to land within Linn County's mapped floodplain, including new buildings, grading, filling, or…

Read full rule →

Polk County

Significant Restrictions

Building in a special flood hazard area of unincorporated Polk County requires a Floodplain Development Permit from the…

Read full rule →

Sioux City

Significant Restrictions

Any grading, filling, or construction inside Sioux City's mapped floodplain overlay districts needs a Floodplain…

Read full rule →

Story County

Some Restrictions

Any development in a mapped floodway, floodway fringe, or general floodplain district in unincorporated Story County…

Read full rule →

Flood Elevation Requirements

FEMA NFIP minimum base flood elevation (BFE) construction standards for properties in mapped flood zones, including freeboard requirements above BFE.