Warwick, RI Environmental Rules: Stormwater Management (2026)
Key Facts
- Plan preparer
- Rhode Island licensed professional engineer
- Design standard
- RI Storm Water Design and Installation Standards Manual
- Storm events covered
- 2-, 10-, 25-, 100-year events
- State tie-in
- RIPDES small MS4 general permit
- Fine
- Up to $250/day (§ 68-16)
Summary
Warwick requires a Rhode Island licensed professional engineer to prepare a stormwater management plan for every development project under Chapter 68, tied to the state's RIPDES small MS4 permit. Plans must control peak discharge for storms up to the 100-year event and include a recorded maintenance agreement.
The ordinance is written to work in conjunction with the Rhode Island department of environmental management's General Permit Rhode Island Pollutant Discharge Elimination System Storm Water Discharge from Small Municipal Separate Storm Sewer Systems and from Industrial Activity at Eligible Facilities Operated by Regulated Small MS4s. ... All applicants are required to develop and submit a storm water management plan prepared by a professional engineer licensed in the state of Rhode Island. All storm water management plans must address storm water management on a site-by-site basis and all requirements of this chapter. All storm water management practices shall be consistent with the Rhode Island Storm Water Design and Installation Standards Manual and the Rhode Island Soil Erosion and Sediment Control Handbook, as amended.
Full Breakdown
Section 68-2 ties Warwick's stormwater rules to the Rhode Island Department of Environmental Management's RIPDES general permit for small municipal separate storm sewer systems (MS4s), since untreated runoff carries suspended solids, nitrogen, phosphorus, hydrocarbons, and road salts into local waters. Section 68-8 requires every applicant to submit a stormwater management plan prepared by a professional engineer licensed in Rhode Island, built to the Rhode Island Storm Water Design and Installation Standards Manual and the Rhode Island Soil Erosion and Sediment Control Handbook. Plans must control post-development peak discharge rates for the 2-year, 10-year, 25-year, and 100-year storm events at pre-development levels, analyze downstream impacts of the 100-year event, and size conveyance systems to handle at least a 25-year storm without erosive flows.
Under Section 68-9, applicants must calculate sub-watershed areas, impervious surface totals, curve numbers, and pre- and post-development discharge rates for each storm frequency. Section 68-13 requires a recorded maintenance agreement for every stormwater facility not dedicated to the city, listing the responsible party and maintenance schedule, and Section 68-13(d) gives the director of public works and building inspector a right of entry to inspect facilities on private property. Section 68-11 further authorizes the city to inspect any best management practice built after the chapter's 2016 enactment to confirm it matches the approved plan.
Violations & Fines
Failing to build or maintain approved stormwater controls is enforced the same way as an erosion control violation: a fine of up to $250.00 per day under Section 68-16, plus revocation of plan approval and mandatory temporary correction within five days and permanent correction within 30 days under Section 68-17. The city can also complete the corrective work itself and place a lien on the property for its costs.
Frequently Asked Questions
Who has to submit a stormwater plan for a Warwick project?
What storm sizes must a Warwick stormwater plan handle?
Does Warwick require ongoing maintenance of stormwater facilities?
Sources & Official References
Other rules in Warwick
Compare Warwick to another location·View the Rhode Island environmental rules overview