Warwick, RI Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Plan preparer
Rhode Island licensed professional engineer
Design standard
RI Storm Water Design and Installation Standards Manual
Storm events covered
2-, 10-, 25-, 100-year events
State tie-in
RIPDES small MS4 general permit
Fine
Up to $250/day (§ 68-16)

Summary

Warwick requires a Rhode Island licensed professional engineer to prepare a stormwater management plan for every development project under Chapter 68, tied to the state's RIPDES small MS4 permit. Plans must control peak discharge for storms up to the 100-year event and include a recorded maintenance agreement.

The ordinance is written to work in conjunction with the Rhode Island department of environmental management's General Permit Rhode Island Pollutant Discharge Elimination System Storm Water Discharge from Small Municipal Separate Storm Sewer Systems and from Industrial Activity at Eligible Facilities Operated by Regulated Small MS4s. ... All applicants are required to develop and submit a storm water management plan prepared by a professional engineer licensed in the state of Rhode Island. All storm water management plans must address storm water management on a site-by-site basis and all requirements of this chapter. All storm water management practices shall be consistent with the Rhode Island Storm Water Design and Installation Standards Manual and the Rhode Island Soil Erosion and Sediment Control Handbook, as amended.

Full Breakdown

Section 68-2 ties Warwick's stormwater rules to the Rhode Island Department of Environmental Management's RIPDES general permit for small municipal separate storm sewer systems (MS4s), since untreated runoff carries suspended solids, nitrogen, phosphorus, hydrocarbons, and road salts into local waters. Section 68-8 requires every applicant to submit a stormwater management plan prepared by a professional engineer licensed in Rhode Island, built to the Rhode Island Storm Water Design and Installation Standards Manual and the Rhode Island Soil Erosion and Sediment Control Handbook. Plans must control post-development peak discharge rates for the 2-year, 10-year, 25-year, and 100-year storm events at pre-development levels, analyze downstream impacts of the 100-year event, and size conveyance systems to handle at least a 25-year storm without erosive flows.

Under Section 68-9, applicants must calculate sub-watershed areas, impervious surface totals, curve numbers, and pre- and post-development discharge rates for each storm frequency. Section 68-13 requires a recorded maintenance agreement for every stormwater facility not dedicated to the city, listing the responsible party and maintenance schedule, and Section 68-13(d) gives the director of public works and building inspector a right of entry to inspect facilities on private property. Section 68-11 further authorizes the city to inspect any best management practice built after the chapter's 2016 enactment to confirm it matches the approved plan.

Violations & Fines

Failing to build or maintain approved stormwater controls is enforced the same way as an erosion control violation: a fine of up to $250.00 per day under Section 68-16, plus revocation of plan approval and mandatory temporary correction within five days and permanent correction within 30 days under Section 68-17. The city can also complete the corrective work itself and place a lien on the property for its costs.

Frequently Asked Questions

Who has to submit a stormwater plan for a Warwick project?
Anyone doing a development or re-development project covered by Chapter 68 must submit a stormwater management plan prepared by a Rhode Island licensed professional engineer under Section 68-8, addressing site-specific runoff controls consistent with the state's Storm Water Design and Installation Standards Manual before the building official will approve the project.
What storm sizes must a Warwick stormwater plan handle?
Section 68-8 requires plans to control post-development peak discharge rates for the 2-year, 10-year, 25-year, and 100-year storm events down to pre-development levels, plus a downstream analysis of the 100-year event, so nearby properties don't see increased flooding from the new development.
Does Warwick require ongoing maintenance of stormwater facilities?
Yes. Section 68-13 requires a recorded maintenance agreement listing the responsible party and inspection schedule for every stormwater facility not turned over to the city, and city officials retain a right of entry to inspect the facility and its maintenance log.

Sources & Official References

Other rules in Warwick

All Warwick rules

Compare Warwick to another location·View the Rhode Island environmental rules overview

Get notified when Stormwater Management in Warwick, RI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.