Skip to main content
CityRuleLookup

Winter Haven, FL Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Runoff standard
Post-development peak ≤ pre-development peak
Design storm
10-year (roads) or 25-year (other uses)
Treatment: 0.5-2 acres
1/4 inch of impervious runoff
Treatment: 2+ acres
1/2 inch of impervious runoff
Exempt lots
Owner-occupied single-family, under 1/2 acre
Governing section
ULDC Section 21-161

Summary

Winter Haven requires most new development and redevelopment to submit a stormwater management plan and hold post-development runoff at or below pre-development levels under Unified Land Development Code Section 21-161. Owner-occupied single-family lots and small redevelopment projects under half an acre are exempt.

Stormwater runoff is recognized, both as a valuable natural resource critical to the maintenance of water quantity in the Central Florida lakes, as well as a significant contributor of pollutants which affect the quality of the lake waters. ... (b)Any person proposing development or redevelopment in the City, which is not exempted by section 21-161(a), shall submit, as part of, or attached to, site plans for the proposed development, a stormwater management plan which demonstrates the measures to be implemented by such person for controlling runoff as required under provisions of this division. ... (c)The maximum volume of post-development off-site discharge shall not exceed the pre-development discharge. The post-development peak rate of runoff leaving the site shall not exceed the pre-development peak rate of runoff for the designated storm event.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 108).

Full Breakdown

Section 21-161 of the Winter Haven Unified Land Development Code regulates stormwater to protect both water quantity in the Central Florida lakes and the quality of water discharged to them. Anyone proposing development or redevelopment that is not exempt under subsection (a) must submit a stormwater management plan with the site plan, showing clearing and grading, contour elevations for existing and post-development conditions, drainage calculations, the work sequence for large projects, and the impact on affected waterways; City approval of that plan is a precondition of the Development Approval Certificate and building permit.

The exemptions cover bona fide agricultural or forest operations, minor home gardening or clearing, emergency repairs, routine system maintenance, owner-occupied single-family lots, single-family lots outside the 100-year floodplain, redevelopment under fifty percent demolition with no added square footage, redeveloped parcels under half an acre, lots in the C-1 Commercial-Downtown district, and parcels served by a regional stormwater system. For non-exempt projects, post-development peak runoff cannot exceed the pre-development peak rate for the applicable design storm, a ten-year 24-hour storm for parking and roadway changes and a twenty-five-year 24-hour storm for other land use changes.

Redeveloped parcels between a half-acre and two acres must treat a quarter inch of runoff from impervious areas, and parcels of two acres or more must treat a half inch, with property owners responsible for ongoing maintenance of their stormwater system.

Violations & Fines

The City Engineer can require corrective maintenance, repair or replacement of a noncompliant stormwater system and has inspection access to stormwater facilities under Section 21-161(f). Failing to submit an approved stormwater management plan before development, or exceeding the allowed post-development discharge rate, blocks issuance of the Development Approval Certificate and building permit and is enforceable under the Winter Haven Code of Ordinances.

Frequently Asked Questions

Does my new house need a stormwater plan in Winter Haven?
Not if you'll live there yourself. Section 21-161(a)(5) exempts single-family residential lots where the property owner will reside in the home once it or an addition is finished, along with single-family lots outside the 100-year floodplain.
How much runoff does a redeveloped commercial lot have to treat?
It depends on size. A redeveloped lot between a half acre and two acres must treat a quarter inch of runoff from impervious areas, and a lot of two acres or more must treat a half inch, unless it's already covered by a State or regional stormwater permit.
Is downtown Winter Haven exempt from stormwater rules?
Yes. Section 21-161(a)(9) exempts lots or parcels in the C-1, Commercial-Downtown zoning district, along with approved developments that have zero lot line requirements, from the stormwater management division's requirements.

Sources & Official References

Other rules in Winter Haven

All Winter Haven rules

Florida rules heatmap·Compare Winter Haven to another location·View the Florida environmental rules overview

Get notified when Stormwater Management in Winter Haven, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.