Skip to main content
CityRuleLookup

Cabarrus County, NC Fence Regulations: Fence Permit Requirements (2026)

Few Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Zoning permit needed?
No, for residential fences
Still must confirm
Property line before installing
Floodway fences
Cannot impede water flow
Height limits still apply
5 ft front, 7 ft rear/side
Governing section
Development Ordinance § 6-9

Summary

Cabarrus County does not require a zoning permit to install a residential fence anywhere in the unincorporated county, per Section 6-9 of the Development Ordinance. Owners are still responsible for locating their property line before building, and any fence in a regulated floodway cannot obstruct water flow.

These county ordinances apply to unincorporated areas of Cabarrus County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A zoning permit is not required to install a residential fence. However, property lines should be identified prior to installation to prevent encroachments onto adjacent properties and/or into public right-of-ways. Fences installed in the regulated floodway must not impede the flow of water or the natural function of the floodway.

Full Breakdown

Section 6-9 of the Development Ordinance, Height limitation on fences in residential districts, states directly that a zoning permit is not required to install a residential fence in unincorporated Cabarrus County. That waiver applies specifically to the zoning permit process the county uses for most other construction; it does not waive the substantive limits in the same section, which still cap rear and side yard fences at seven feet and front yard fences at five feet, with an exemption for recreational fences. Because no permit review or survey is required, the ordinance advises property owners to identify their property lines before installation, since a fence built past the boundary can encroach onto a neighbor's lot or into a public right-of-way, either of which the county can still act on even though no permit was needed to build it.

A separate condition applies to any fence installed in a regulated floodway: it must not impede the flow of water or the natural function of the floodway, regardless of the permit exemption. This is distinct from the four-foot barrier that Section 6-10 separately requires around outdoor swimming pools, which references the North Carolina Building Code rather than the county's own zoning permit process. Cabarrus County Planning and Development, which administers Chapter 6, does not review residential fence plans before construction begins, but it does respond to encroachment and floodway complaints after the fact.

Violations & Fines

There's no permit-related fine because Section 6-9 waives the zoning-permit requirement outright; however, a fence built over the property line or into the public right-of-way can be ordered relocated by Planning and Development following a boundary dispute or encroachment complaint, and one that blocks water flow in a mapped floodway is a separate zoning violation subject to removal.

Frequently Asked Questions

Do I need a permit to put up a fence in Cabarrus County?
No. Section 6-9 of the county's Development Ordinance specifically exempts residential fences from the zoning permit requirement that applies to most other construction. You can install a fence without applying to Planning and Development first, but you're still bound by the five and seven-foot height limits and the floodway restriction in the same section.
What should I do before building a fence without a permit?
Because no survey or permit review is required, Section 6-9 advises identifying your property lines before installation to avoid encroaching onto a neighbor's lot or into a public right-of-way. A misplaced fence can still trigger a boundary dispute or a right-of-way encroachment order from the county even though no permit was needed to build it.
Can I build a fence in a floodway without a permit?
You still do not need a zoning permit, but Section 6-9 requires that any fence installed in a regulated floodway not impede the flow of water or the floodway's natural function. Planning and Development can require modification or removal of a floodway fence that violates this standard, permit or no permit.

Sources & Official References

Other rules in Cabarrus County

All Cabarrus County rules

Compare Cabarrus County to another location·View the North Carolina fence regulations overview

Get notified when Fence Permit Requirements in Cabarrus County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.