Key Facts

Applies
All new residential and commercial construction, parish-wide
Elevation
1 foot above base flood elevation or roadway crown
Standard used
Whichever elevation is higher
Section
Bossier Parish Code § 54-91(8)
Penalty
Up to $100 fine or 5 days jail per day

Summary

Bossier Parish Code § 54-91(8) extends the one-foot freeboard rule to every new residential and commercial structure parish-wide, even outside mapped special flood hazard areas, requiring the lowest floor elevated one foot above base flood elevation or one foot above the adjacent roadway crown, whichever is higher.

These county ordinances apply to unincorporated areas of Bossier Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(8)As an exception to division 5, section 54-91, "All new residential and commercial construction, whether located within a special flood hazard area or not, shall have the lowest floor, including basement, elevated to one foot or more above the base flood elevation or one foot above the adjacent roadway crown elevation, whichever elevation is higher."

Full Breakdown

Chapter 54's general flood hazard reduction standards at § 54-91 apply inside every area of special flood hazard, covering anchoring, flood-resistant materials, and protected mechanical, electrical, plumbing, and HVAC equipment (§ 54-91(1) through (7)). Subsection (8) then goes further and applies regardless of mapping: it states that as an exception to the rest of § 54-91, all new residential and commercial construction, whether located within a special flood hazard area or not, must have the lowest floor, including any basement, elevated to one foot or more above the base flood elevation, or one foot above the adjacent roadway crown elevation, whichever elevation is higher.

That means a lot outside the FEMA-mapped special flood hazard area in unincorporated Bossier Parish is not automatically excused from a freeboard requirement; the roadway-crown alternative gives builders a usable benchmark even where no base flood elevation has been formally established for the parcel. The floodplain administrator, the Bossier Parish Administrator/Engineer under § 54-71, reviews permit applications under § 54-73 to confirm the proposed building site, including any manufactured home placement, is reasonably safe from flooding before work begins, whether or not the parcel falls inside a mapped hazard area.

This general standard works alongside the more detailed elevation requirements at § 54-92 for structures that do sit inside a mapped special flood hazard area.

Violations & Fines

Constructing a new residential or commercial building anywhere in unincorporated Bossier Parish without meeting the freeboard elevation required by § 54-91(8) violates Chapter 54's flood damage prevention article. Under § 54-97, that is a misdemeanor punishable by a fine of up to $100.00 or up to five days in jail, or both, with each day of continuing noncompliance treated as a separate violation, plus the violator's court costs and case expenses.

Frequently Asked Questions

Do I need to elevate my house if it's outside the mapped flood zone?
Yes. Code § 54-91(8) is written as an exception that reaches beyond mapped hazard areas: every new residential and commercial structure in unincorporated Bossier Parish must have its lowest floor elevated one foot above the base flood elevation, or one foot above the adjacent roadway crown, whichever is higher.
What is the roadway crown standard for?
It gives builders a usable elevation benchmark on parcels where a formal base flood elevation has not been established. Section 54-91(8) lets the lowest floor be set one foot above the adjacent roadway crown instead, whichever of the two elevations works out higher for that site.
Who reviews my building plans for this freeboard requirement?
The Bossier Parish Administrator/Engineer serves as the floodplain administrator under § 54-71 and reviews permit applications under § 54-73 to confirm a proposed building site is reasonably safe from flooding, whether or not the parcel sits inside a FEMA-mapped special flood hazard area.
What happens if a structure is built without the required freeboard?
It is a misdemeanor under § 54-97, carrying a fine of up to $100.00 or up to five days in jail, or both. Each day the noncompliance continues counts as a new violation, and the responsible party also pays all costs and expenses of the case.

Sources & Official References

Other rules in Bossier Parish

All Bossier Parish rules

Compare Bossier Parish to another location·View the Louisiana hurricane preparedness overview

Get notified when Flood Elevation in Bossier Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.