Bossier Parish, LA Hurricane Preparedness: Flood Elevation (2026)
Key Facts
- Applies
- All new residential and commercial construction, parish-wide
- Elevation
- 1 foot above base flood elevation or roadway crown
- Standard used
- Whichever elevation is higher
- Section
- Bossier Parish Code § 54-91(8)
- Penalty
- Up to $100 fine or 5 days jail per day
Summary
Bossier Parish Code § 54-91(8) extends the one-foot freeboard rule to every new residential and commercial structure parish-wide, even outside mapped special flood hazard areas, requiring the lowest floor elevated one foot above base flood elevation or one foot above the adjacent roadway crown, whichever is higher.
(8)As an exception to division 5, section 54-91, "All new residential and commercial construction, whether located within a special flood hazard area or not, shall have the lowest floor, including basement, elevated to one foot or more above the base flood elevation or one foot above the adjacent roadway crown elevation, whichever elevation is higher."
Full Breakdown
Chapter 54's general flood hazard reduction standards at § 54-91 apply inside every area of special flood hazard, covering anchoring, flood-resistant materials, and protected mechanical, electrical, plumbing, and HVAC equipment (§ 54-91(1) through (7)). Subsection (8) then goes further and applies regardless of mapping: it states that as an exception to the rest of § 54-91, all new residential and commercial construction, whether located within a special flood hazard area or not, must have the lowest floor, including any basement, elevated to one foot or more above the base flood elevation, or one foot above the adjacent roadway crown elevation, whichever elevation is higher.
That means a lot outside the FEMA-mapped special flood hazard area in unincorporated Bossier Parish is not automatically excused from a freeboard requirement; the roadway-crown alternative gives builders a usable benchmark even where no base flood elevation has been formally established for the parcel. The floodplain administrator, the Bossier Parish Administrator/Engineer under § 54-71, reviews permit applications under § 54-73 to confirm the proposed building site, including any manufactured home placement, is reasonably safe from flooding before work begins, whether or not the parcel falls inside a mapped hazard area.
This general standard works alongside the more detailed elevation requirements at § 54-92 for structures that do sit inside a mapped special flood hazard area.
Violations & Fines
Constructing a new residential or commercial building anywhere in unincorporated Bossier Parish without meeting the freeboard elevation required by § 54-91(8) violates Chapter 54's flood damage prevention article. Under § 54-97, that is a misdemeanor punishable by a fine of up to $100.00 or up to five days in jail, or both, with each day of continuing noncompliance treated as a separate violation, plus the violator's court costs and case expenses.
Frequently Asked Questions
Do I need to elevate my house if it's outside the mapped flood zone?
What is the roadway crown standard for?
Who reviews my building plans for this freeboard requirement?
What happens if a structure is built without the required freeboard?
Sources & Official References
Other rules in Bossier Parish
Compare Bossier Parish to another location·View the Louisiana hurricane preparedness overview
See something wrong?