Gretna, LA Hurricane Preparedness: Flood Elevation (2026)
Key Facts
- Floor elevation approval
- required before superstructure erected
- Grade slope toward sidewalk
- 1/2 inch per foot of sidewalk width
- Grade slope toward rear line
- 1 inch per 20 feet
- Elevated driveway max slope
- 5% without a zoning variance
- Occupancy hold
- final elevation certificate required first
Summary
Gretna Code of Ordinances § 10-15 requires an acceptable floor elevation before any superstructure is erected and requires new construction to be raised to grade with approved sanitary fill, and it withholds any certificate of use and occupancy until a final elevation certificate is secured.
(a)Generally. ... (1)Floor elevation. No superstructure shall be erected until an acceptable floor elevation has been determined.(2)Grade elevation. No new superstructure shall have fully met the requirements of this Code unless the site has been raised to grade with approved sanitary fill. ... (e)Drainage servitude and facilities. ... (5)A certificate of use and occupancy and compliance shall not be issued until a final elevation certificate has been secured.
Full Breakdown
Section 10-15(a) sets Gretna's local elevation-certification chain for new construction, on top of any state or federal flood requirement. Subsection (a)(1), Floor elevation, states plainly that "no superstructure shall be erected until an acceptable floor elevation has been determined," making floor-elevation approval a precondition to starting construction rather than a step that can be handled afterward. Subsection (a)(2), Grade elevation, requires the site to be raised to grade with approved sanitary fill, sloping upward from the established curb height at one-half inch per foot of sidewalk width, then one inch per 20 feet toward the rear property line, or an alternate method the code official approves; once an acceptable grade is set, the owner is responsible for maintaining it.
00 general liability policy and a riggers endorsement under § 10-12. The whole elevation chain closes at subsection (e)(5): "A certificate of use and occupancy and compliance shall not be issued until a final elevation certificate has been secured," so a builder cannot get a family into a raised or new home until that certificate confirming the as-built elevation is on file with the building official.
Violations & Fines
Occupying or using a structure without the final elevation certificate required by § 10-15(e)(5) blocks issuance of the certificate of use and occupancy outright. Building without an acceptable floor or grade elevation under § 10-15(a) is separately punishable under Gretna's general penalty, § 1-8(d), by a fine of up to $500.00, with continuing violations counted as a new offense each day.
Frequently Asked Questions
Can I start building in Gretna before my floor elevation is approved?
Does Gretna require a final elevation certificate before I can move in?
What slope does Gretna require when grading a raised lot?
Is a variance needed for a steep driveway on an elevated Gretna home?
Sources & Official References
Other rules in Gretna
Compare Gretna to another location·View the Louisiana hurricane preparedness overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.