Shoreline, WA Invasive Plant Rules: Prohibited Species (2026)
Key Facts
- Exempt activity
- Hand removal of listed noxious weeds/invasive vegetation
- Governing list
- WA State or King County Noxious Weed Control Board
- Clearing threshold
- Over 500 sq ft/year needs a permit
- Method limit
- Hand labor and handheld tools only
- Replanting
- Native species required immediately after removal
- Enforcement
- SMC § 20.80.090 unauthorized critical area alteration
Summary
In the City of Shoreline, removing noxious weeds or invasive vegetation listed by the Washington State or King County Noxious Weed Control Board from a critical area or its buffer is exempt from a critical area permit under Shoreline Municipal Code § 20.80.075(E). The exemption covers hand-pulled removal only; riding mowers, herbicides, and larger clearing projects trigger separate City permit review.
§ 20.80.075. Exemptions. ... Notwithstanding the exemptions provided by this section, any otherwise exempt activities occurring in or near a critical area or critical area buffer should meet the purpose and intent of SMC § 20.80.010 and should consider on-site alternatives that avoid or minimize impacts. ... The following activities shall be exempt from the provisions of this chapter, but are not exempt from applicable permits: ... ... E. Minor Conservation and Enhancement. Minor conservation and enhancement of critical areas and buffers not associated with mitigation that does not alter the location, nor reduce the dimensions or size of the critical area or buffer, and results in improvement of the critical area functions and values consistent with the following: 1. Eligible activities include: a. Removal of noxious weeds or invasive vegetation as identified by the Washington State or King County Noxious Weed Control Board; ... ... 5. Plants that appear on the Washington State or King County Noxious Weed Control Board lists must be handled and disposed of in accordance with the best management practices appropriate to that species and approved by the City when permit review is applicable;
Full Breakdown
Shoreline's critical areas chapter, SMC § 20.80.075(E), treats removal of noxious weeds and invasive vegetation identified on the Washington State or King County Noxious Weed Control Board lists as 'minor conservation and enhancement,' exempt from a critical area permit when it does not enlarge the disturbed footprint. The work must stay above the ordinary high-water mark, avoid very high risk landslide areas unless within a tree's critical root zone, and be performed with hand labor and handheld tools. Riding mowers, light mechanical cultivating equipment, herbicides, or biological controls are allowed only when the King County Noxious Weed Control Board prescribes them and the City approves the method on private property, or when the work follows SMC § 20.80.085 on City-owned land.
Removed plant material identified on the State or King County lists must be handled and disposed of using best management practices matched to that species. Replanting with site-appropriate native species at natural densities must happen immediately after removal. Property owners who clear more than 500 square feet of a critical area or buffer in a calendar year must submit a planting plan (work area, removal method, native planting plan and density, and project schedule) and a stormwater pollution prevention plan as part of a clearing and grading permit application.
The exemption does not excuse damage beyond what removal requires; any incidental alteration of the critical area must be restored, rehabilitated, or replaced at the responsible party's expense, and exceeding the exemption's scope is enforceable as an unauthorized critical area alteration under SMC § 20.80.090.
Violations & Fines
Clearing noxious weeds beyond hand-tool methods, using herbicides or mowers without King County Noxious Weed Control Board authorization, or disturbing more than 500 square feet without a clearing and grading permit exceeds the SMC § 20.80.075(E) exemption. The Director can require after-the-fact permitting and restoration consistent with a critical area report, with enforcement as an unauthorized critical area alteration under SMC § 20.80.090 and restoration costs borne by the responsible party.
Frequently Asked Questions
Do I need a City permit to pull noxious weeds on my Shoreline property?
Can I use a riding mower or herbicide to clear invasive plants?
What if I need to clear a large infestation?
Sources & Official References
Other rules in Shoreline
Compare Shoreline to another location·View the Washington invasive plant rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Prohibited Species in Nearby Cities
How other cities in King County handle prohibited species.