Skip to main content
CityRuleLookup

Los Banos, CA Landscaping Rules: Rainwater Harvesting (2026)

Few Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
§ 9-6.03.16, Stormwater management and rainwater retention
Mandate level
Recommended, not required
Design benchmark
1-inch or 85th percentile 24-hour storm capture recommended
Applies to
New construction & rehabilitated landscape projects
Enforcing department
Los Banos Public Works Department
Related duty
No irrigation runoff onto streets, § 9-6.04.02

Summary

Los Banos encourages, but does not mandate, rainwater harvesting under its water efficient landscape ordinance. Section 9-6.03.16 recommends capture and infiltration measures like rain gardens and cisterns for new and rehabilitated landscape projects, leaving the choice to the applicant.

(a) Stormwater management practices minimize runoff and increase infiltration which recharges groundwater and improves water quality. Implementing stormwater best management practices into the landscape and grading design plans to minimize runoff and to increase on-site rainwater retention and infiltration are encouraged. ... (d) It is strongly recommended that landscape areas be designed for capture and infiltration capacity that is sufficient to prevent runoff from impervious surfaces (i.e., roof and paved areas) from either: (1) the one inch, 24 hour rain event; or (2) the 85th percentile, 24 hour rain event, and/or additional capacity as required by any applicable local, regional, State or Federal regulation. ... (5) Incorporate rain gardens, cisterns, and other rain harvesting or catchment.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4356507; v3 updated 2025-03-05).

Full Breakdown

16, Stormwater management and rainwater retention. 01. 06(a)(3). The ordinance sets a design benchmark: landscapes are strongly recommended to be built with capture and infiltration capacity sufficient to prevent runoff from roofs and paved areas during either a one inch, 24 hour rain event or the 85th percentile, 24 hour rain event, whichever any applicable local, regional, State or Federal regulation requires. Among the measures the ordinance lists as recommended, not mandatory, are grading impervious surfaces such as driveways to drain toward vegetated areas, minimizing paved surface area, using permeable pavers or porous concrete, directing roof and paved runoff into planting beds, and incorporating rain gardens, cisterns and other rain harvesting or catchment devices, along with infiltration beds, swales, basins and drywells.

Because every one of these measures is phrased as encouraged, recommended or strongly recommended rather than required, a Los Banos property owner who skips a rainwater harvesting system is not in violation of this chapter.

Violations & Fines

Failing to install rainwater harvesting features carries no penalty because § 9-6.03.16 only recommends them. However, letting irrigation runoff or overspray leave your landscape and flow into the street or onto a neighboring property violates the separate water waste provision at § 9-6.04.02, enforceable through the City's water waste prevention program administered by Public Works.

Frequently Asked Questions

Does Los Banos require rain barrels or cisterns on new homes?
No. Section 9-6.03.16 lists rain gardens, cisterns and other rain harvesting or catchment as recommended stormwater measures for new and rehabilitated landscapes, but nothing in the ordinance makes installing one mandatory; it is one option among several a project applicant may choose.
What stormwater capture target does the City recommend?
The ordinance strongly recommends landscapes be designed with enough capture and infiltration capacity to prevent runoff from roofs and paved surfaces during a one inch, 24 hour rain event or the 85th percentile 24 hour rain event, whichever a governing local, regional, State or Federal regulation requires.
Who do I contact about stormwater requirements for my project?
Section 9-6.03.16(b) directs project applicants to the City of Los Banos Public Works Department for information on any applicable stormwater technical requirements before finalizing landscape and grading plans.

Sources & Official References

Other rules in Los Banos

All Los Banos rules

California rules heatmap·Compare Los Banos to another location·View the California landscaping rules overview

Get notified when Rainwater Harvesting in Los Banos, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.