Skip to main content
CityRuleLookup

Portland, OR Landscaping Rules: Rainwater Harvesting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Cistern height for unlimited setback placement
6 feet or less
Encroachment cap for taller cisterns
20% of setback depth
Minimum lot-line clearance (taller cisterns)
3 feet
Plumbing permit required
City Code § 25.05.010
Zones covered
Single-dwelling R zones (Title 33.110)

Summary

Portland's zoning code lets water collection cisterns 6 feet or less in height extend fully into required side and rear setbacks in single-dwelling zones, while taller cisterns face the standard 20 percent setback encroachment limit and a 3-foot lot-line buffer.

The following minor features of a building may extend into the entire required building setbacks: a. Utility connections attached to the building that are required to provide services such as water, electricity, and other similar utility services; b. Gutters and downspouts that drain stormwater off a roof of the structure; c. Stormwater planters that are no more than 2-1/2 feet above the ground; d. Water collection cisterns that are 6 feet or less in height;

Source: Portland Clean River RewardsView official code

Full Breakdown

Portland's zoning code (Title 33.110.220) governs where rainwater cisterns sit relative to property lines in single-dwelling zones. Cisterns 6 feet or less in height may extend into the entire required setback: no distance-from-lot-line limit applies. Larger cisterns count as a minor projection capped at 20 percent of the setback depth and must stay at least 3 feet from any lot line. Separately, Title 25.05.010 requires a plumbing permit from Portland Permitting & Development before installing, altering, or repairing a rainwater harvesting system's cisterns, pipes, and pumps. Historic-district properties face additional screening and color-matching standards under 33.218.100.

Violations & Fines

Installing an oversized or improperly placed cistern violates the zoning setback standards enforced by Portland Permitting & Development; installing a rainwater harvesting system without the required permit under Title 25.05.010 can trigger a stop-work order and correction notice.

Frequently Asked Questions

Do I need a permit to install a rain barrel in Portland?
Not for a small rain barrel, but any cistern wired into a rainwater harvesting system with cisterns, pipes, and pumps needs a plumbing permit from Portland Permitting & Development under City Code § 25.05.010 before installation.
How close to my property line can a rainwater cistern sit?
In single-dwelling zones, a cistern 6 feet or less in height can sit anywhere in the setback with no minimum distance; taller cisterns must stay at least 3 feet from the lot line.

Sources & Official References

Other rules in Portland

All Portland rules

Compare Portland to another location·View the Oregon landscaping rules overview

Get notified when Rainwater Harvesting in Portland, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.