Tree removal permit rules in New Brunswick, NJ, sometimes called heritage tree, protected tree, or street tree ordinances, list which trees require a permit before you can cut them down.

Key Facts

Size trigger
DBH of six inches or greater (Section 8.48.140)
Residential permit trigger
Five or more trees of 10-inch DBH in two years on a smaller lot
Review fee
$100 with the application (Section 8.48.260)
Trust fund payment
$80.00 per caliper inch not replanted on site
City decision deadline
30 days, then deemed approved (non-subdivision lots)
Permit term
One year where no building permit is required
Enforcement fine
$100 to $2,500 under Section 17.08.040

Summary

In the City of New Brunswick, New Jersey, Chapter 8.48 bars cutting or removing any tree with a diameter at breast height of six inches or greater outside its terms. Residential lots need a tree removal permit from the administrative officer once removals reach the printed thresholds, and commercial, industrial and business lots are covered too. The review fee is $100.

A.Applicability. On any residential lot that is less than two times the required lot size with a tree removal rate of five or more trees with a 10-inch DBH or greater in a two-year period; or, any residential lot that is twice the required lot size or greater with a tree removal rate of more than six trees with a 10-inch DBH or greater in a two-year period shall submit an application for a tree removal permit to the administrative officer. The application and development proposal shall conform to the provisions contained herein.B.The provisions of this section shall also apply to all commercial, industrial and business zoned lots. ... F.Tree Removal Criteria. In addition to the design requirements stated above, the administrative officer may grant a tree removal permit based upon one or more of the following circumstances:1.Where the location of an existing tree provides no other alternative but to place a structure outside the permitted building setbacks.2.Where the location of an existing tree negatively impacts on an existing septic field.

Full Breakdown

Chapter 8.48 of the New Brunswick Municipal Code, titled Tree Replacement Requirements, declares in Section 8.48.120 that no tree shall be cut or otherwise removed from any lands in the City of New Brunswick without a tree removal permit, subject to the exemptions in Section 8.48.150. Section 8.48.140 sets the size trigger at a diameter at breast height, or DBH, of six inches or greater, measured four and one-half feet above ground level on the downhill side. Applications tied to a major subdivision, minor subdivision or site plan carry the tree permit request to the planning board or zoning board of adjustment. Every other lot uses Section 8.48.180 and applies to the administrative officer.

For a residential lot smaller than two times the required lot size, the permit application is triggered by a removal rate of five or more trees with a 10-inch DBH or greater in a two-year period. For a lot twice the required size or larger, the trigger is more than six such trees in two years. The applicant lists each tree of 10 inches or more by size and species, states the purpose of the removal and supplies a sketch. Removal cannot exceed one-half acre or 50 percent of the lot size, whichever is less.

The administrative officer grants a permit on printed criteria: a tree that forces a structure outside the permitted setbacks, one that harms a septic field, one that leaves no other placement for a building, addition, driveway, deck, patio or lawn area, one that inhibits enjoyment of an outdoor pool, patio or deck, or one whose angle or growth is a hazard to structures or human life. A request that fails those criteria can be forwarded to the technical advisory committee. Section 8.48.190 also permits removal where the area will be occupied by a building, street, driveway, parking area, patio, swimming pool or utility line, or lies 20 feet or less from those features.

Replacement follows Section 8.48.170. A tree between 6 and 12 inches requires 3 replacement trees of 3-inch caliper, and the count rises to 10 for a tree between 30 and 36 inches. Replacements that cannot go on site are paid into the Tree Preservation Trust Fund at $80.00 per caliper inch under Section 8.48.250. For non-subdivision lots the city must act within 30 days or the application is deemed approved (Section 8.48.210). A permit for a lot needing no building permit lasts one year (Section 8.48.220), and the holder gives written notice at least four business days before work starts (Section 8.48.240).

Violations & Fines

Under Section 8.48.270, when regulated trees are removed without a tree removal permit, the affected areas must be replanted to the satisfaction of the appropriate municipal authority and the offending party is liable for penalties under Section 17.08.040. That section sets a fine of no less than $100 nor more than $2,500, or imprisonment not exceeding 30 days, or both, for each violation, plus costs, and treats each day as a separate violation.

Frequently Asked Questions

Do I need a permit to remove a tree from my house lot in New Brunswick?
Section 8.48.120 says no tree shall be cut or removed from any lands in the city without a tree removal permit, apart from the Section 8.48.150 exemptions. Section 8.48.180 requires a residential application once removals reach five or more trees of 10-inch DBH in two years on a lot under twice the required size, or more than six on a larger lot.
Which trees are exempt from Chapter 8.48?
Section 8.48.150 exempts commercial nurseries and fruit orchards, Christmas tree farms, trees ordered removed by a government authority, dead, dying or diseased trees, trees causing structural damage, trees on or over a public right-of-way or public land, utility right-of-way pruning, and projects approved before the ordinance took effect.
How many replacement trees must I plant?
Section 8.48.170 uses a schedule keyed to the removed tree: 1 replacement for a tree under 6 inches, 3 for 6 to 12 inches, 4 for 12 to 18, 5 for 18 to 24, 7 for 24 to 30 and 10 for 30 to 36. Replacements are 3-inch caliper, and cemetery reforestation is one-third the requirement.
What if the city does not answer my application?
Under Section 8.48.210, for a residential, commercial, business or industrial lot outside a subdivision or site plan, the city must act within 30 days of receipt or within any additional time the applicant consents to. Failure to act in that window is deemed an approval, and a tree removal permit is then issued.

Sources & Official References

Other rules in New Brunswick

All New Brunswick rules

Compare New Brunswick to another location·View the New Jersey landscaping rules overview

Get notified when Tree Removal & Heritage Trees in New Brunswick, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Tree Removal & Heritage Trees in Nearby Cities

How other cities in this county handle tree removal & heritage trees.

Edison, NJ
Some Restrictions