Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Tree removal permit rules in Stonecrest, GA, sometimes called heritage tree, protected tree, or street tree ordinances, list which trees require a permit before you can cut them down.

Key Facts

Survey threshold
Trees 18 inches DBH or larger
Plan approval
Required before development/building permit issues
Installation timing
Tree protection measures before land disturbance
Final check
Inspection required before certificate of occupancy
Enforcement
Permit voidable for plan violations (§14-518(d))

Summary

In the City of Stonecrest, any land disturbance, development, building permit or preliminary subdivision plat application must include a tree survey identifying every tree 18 inches DBH or larger, under Stonecrest Code § 14-518. No development or building permit issues until the Director of Community Development approves the accompanying tree protection plan.

a tree survey shall be required as part of any application for a land disturbance permit, development permit, building permit or preliminary subdivision plat. Except as provided elsewhere in this section, all trees 18 inches (DBH) and larger shall be identified. ... No development or building permit shall be issued until the tree protection plan has been approved by the Director of Community Development.(9)All tree protection measures shall be installed prior to land disturbance. ... Issuance of a building or land development permit shall be conditioned on the approved tree protection plan and conformance to the provisions of these regulations. Any permit may be voided if its terms are violated.

Full Breakdown

Section 14-518 lays out the procedural gate that sits ahead of any tree removal tied to development in Stonecrest. Before filing, an applicant is encouraged to hold a pre-application conference with the Director of Community Development to review how the tree protection ordinance applies to the specific property. The formal application itself must include a tree survey identifying, by size, species and location, every tree 18 inches DBH or larger, with specimen trees separately identified; a single residential lot where the applicant intends to reside can be excused from the survey at the Director's discretion, and the Director may allow sampling methods to estimate tree density in forested areas.

The application must also carry a tree protection plan defining the limits of land disturbance, clearing, grading and trenching, marking tree save areas and specimen trees, detailing protection measures such as tree fencing, erosion control fencing, tree wells and aeration systems, coordinating utility line routing to avoid critical root zones, and calculating the tree density proposed on-site under § 14-520. After the Director schedules and conducts a site inspection, with the applicant invited to attend, the plan is either approved or denied in writing with stated reasons.

No development or building permit may issue until the Director approves the tree protection plan, and every tree protection measure required by that plan must be installed before land disturbance begins. At the back end, the Director inspects again before signing off on a certificate of occupancy, confirming that trees marked to remain are healthy and that all replacement trees have been planted as required, and any permit whose tree protection terms are violated can be voided.

Violations & Fines

Beginning land disturbance before the Director of Community Development approves the tree protection plan, or before the required tree protection fencing and other measures are installed, violates § 14-518(b)(8)-(9); § 14-518(d) lets the city void the development or building permit outright for a violation of the plan's terms, and the Director will withhold a certificate of occupancy under § 14-518(c) until damaged or missing trees are replaced.

Frequently Asked Questions

Do I need a tree survey to get a building permit in Stonecrest?
Yes, in most cases. Section 14-518 requires a tree survey identifying every tree 18 inches DBH or larger as part of any application for a land disturbance permit, development permit, building permit, or preliminary subdivision plat, though a single owner-occupied residential lot may be excused at the Director's discretion.
When must tree protection fencing go up on a Stonecrest project?
Before any land disturbance begins. Section 14-518(b)(9) requires all tree protection measures called for in the approved tree protection plan to be installed prior to land disturbance, and § 14-518(b)(8) bars issuance of a development or building permit until that plan is approved.
Can Stonecrest revoke my permit over a tree protection violation?
Yes. Section 14-518(d) conditions the development or building permit on the approved tree protection plan and states that any permit may be voided if its terms are violated, and § 14-518(c) also blocks a certificate of occupancy until the Director confirms surviving and replacement trees meet the plan.

Sources & Official References

Other rules in Stonecrest

All Stonecrest rules

Compare Stonecrest to another location·View the Georgia landscaping rules overview

Get notified when Tree Removal & Heritage Trees in Stonecrest, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.