Skokie, IL Noise from Specific Sources: Generator Noise (2026)
Key Facts
- Decibel limit
- 70 dB at full load
- Testing hours
- Per Sec. 42-78(2) allowed times
- Setback from lot line
- 6 feet minimum
- Installation location
- At grade level
- Permit required
- Yes, before install/replacement
Summary
Skokie caps residential electric generators at 70 decibels under full load and restricts testing to the hours set for equipment noise in the Village's general noise chapter, with manufacturer specs required at permit application.
(3)Electric generators cannot have a decibel level over 70 dB at full load as specified by the manufacturer of the equipment. Specifications shall be submitted for review at the time of permit application.(4)Electric generators may only be tested during times listed in Sec. 42-78(2).
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 205 | Zoning: Supplement 89).
Full Breakdown
Skokie Village Code Sec. 118-66(c)(3) sets a hard decibel ceiling for electric generators on lots with a detached or two-unit multifamily residence: the unit cannot exceed 70 dB at full load, as specified by the equipment manufacturer, and those manufacturer specifications must be submitted for Village review at the time of permit application. Sec. 118-66(c)(4) further limits testing of a residential generator to the times listed in Sec. 42-78(2) of the general Village Code, tying routine maintenance runs to the same allowed-hours framework the Village uses for other noise-generating equipment.
These rules sit inside the same section that governs air conditioning condensers, and the surrounding residential conditions apply to generators too: a permit is required for installation or replacement under Sec. 118-66(a), the unit cannot sit in a required front yard or a side yard facing a street under Sec. 118-66(b), and on a detached or two-unit multifamily lot the unit must be installed at grade level and at least 6 feet from a lot line under Sec. 118-66(c)(1) and (2). This section was last amended by Ord. No. 19-8-C-4478 on August 19, 2019, adding the decibel and testing-hours language after the section's broader 2019 rewrite under Ord. No. 19-4-C-4451.
Violations & Fines
Operating or testing a generator above the 70 dB limit, or outside the permitted testing window in Sec. 42-78(2), violates Sec. 118-66(c) and is unlawful under Sec. 118-9; the Zoning Official can order the condition corrected by written notice. Installing a generator without the required Village permit is a separate violation of Sec. 118-66(a). With no specific fine set in the zoning chapter, the Village's standard penalty under Sec. 1-6 applies: a fine of up to $750 for each day the violation continues.
Frequently Asked Questions
How loud can a home backup generator be in Skokie?
When can I test my generator in Skokie?
Do I need a permit to install a generator in Skokie?
Sources & Official References
Other rules in Skokie
Compare Skokie to another location·View the Illinois noise from specific sources overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Generator Noise in Nearby Cities
How other cities in Cook County handle generator noise.