Bartow County, GA Outdoor Lighting: Light Trespass & Shielding (2026)
Key Facts
- Pole height cap
- 40 feet maximum
- Direction requirement
- Lighting must be directed downward
- Flood/spot lamp angle
- No higher than 45° above straight down
- Citation
- Zoning Ordinance § 7.9.6
- First offense fine
- $300 (Article VII violation)
Summary
New commercial and office development in unincorporated Bartow County must aim outdoor lighting downward and keep light fixture poles under 40 feet, with fixtures shielded so glare and stray light don't cross onto neighboring lots or the public right-of-way. Flood and spot lamps face an added angle limit.
All site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas. Light fixture poles cannot exceed forty (40) feet in height. Outdoor lighting fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps must be positioned no higher than 45 degrees above straight down (halfway between the vertical and the horizontal) when the source is visible from any off-site residential property or public roadway.
Full Breakdown
Bartow County Zoning Ordinance Sec. 6, printed under the O/I office and institutional district's development standards and repeated with the same wording for other non-residential districts such as C-N, requires that all site lighting be directed downward onto the site, whether on the exterior of buildings or in parking areas, and caps light fixture poles at 40 feet in height. Fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps get an additional rule: when the light source is visible from any off-site residential property or public roadway, the lamp must be positioned no higher than 45 degrees above straight down, meaning it can't be aimed anywhere close to horizontal.
These standards apply to new developments and to any existing development that expands by 50 percent or more in parking spaces or gross floor area. Before a building permit issues, an applicant must submit a site plan or structural exterior plan to the Zoning Administrator showing compliance with the lighting standards, so the review happens at the permitting stage rather than after a neighbor complains.
Violations & Fines
A development that installs lighting exceeding the 40-foot pole height, fails to shield fixtures from crossing lot lines, or skips the required lighting site-plan submittal is subject to enforcement by the Zoning Administrator under Sec. 13.2, either through a criminal citation in magistrate court or a civil fine and injunction in superior court. Because Sec. 7.9.6 falls under Article VII, Sec. 13.3's fine schedule for other articles applies: $300 for a first offense, $500 for a second, and $800 for a third or later offense.
Frequently Asked Questions
Are there rules limiting how bright or how high outdoor lighting can be in Bartow County?
Do flood lights or spotlights face extra restrictions?
When does a business have to prove its lighting complies with this rule?
Sources & Official References
Other rules in Bartow County
Compare Bartow County to another location·View the Georgia outdoor lighting overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.