James City County, VA Parking Rules: EV Charging (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Use status
Permitted accessory use, all districts
Approval needed
No SUP or rezoning required
Parking credit
Counts toward minimum parking
ADA rule
1 accessible charging space per lot
Screening
Landscaping, fencing or berms required

Summary

James City County allows electric vehicle charging stations as an accessory use to off-street parking in every zoning district under Sec. 24-63, and lets those spaces count toward a site's minimum parking requirement. At least one charging space per lot must be ADA-accessible, and stations must be screened and lit if used at night.

These county ordinances apply to unincorporated areas of James City County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Electric vehicle charging stations of any level shall be permitted as an accessory use to off-street parking in all zoning districts. The stations shall comply with the following:(1)Parking spaces designated for electric vehicle charging stations may be used in the calculation for meeting minimum parking requirements.(2)At least one space designated for an electric vehicle charging station per parking lot shall be ADA-accessible, but it shall not be designated as exclusively for use by persons with disabilities. ... (3)All electric vehicle charging stations shall be screened from outside of the parking lot with landscaping, fencing or berms.

Full Breakdown

Sec. 24-63 permits electric vehicle charging stations of any level as an accessory use to off-street parking in every zoning district in James City County, so a landowner does not need a special use permit or rezoning just to add chargers to an existing or planned lot. Parking spaces built out for EV charging can be counted toward the minimum parking a site is required to provide, so chargers do not force a developer to build extra spaces on top of the code minimum. At least one charging space per parking lot must meet ADA accessibility standards, though the code specifically bars designating that space as exclusively for use by persons with disabilities, keeping it available to any EV driver.

Every charging station must be screened from view outside the parking lot using landscaping, fencing or berms, and the county allows a site to satisfy that screening through the existing parking lot landscaping standards; stations retrofitted into an already-built lot may be required to add extra landscaping if the planning director finds the existing screening insufficient. Stations expected to operate after dark must have adequate lighting under the ordinance's lighting division, and a lot's existing nighttime parking lot lighting can satisfy that requirement, though a retrofit may again be required to add lighting if the planning director determines the existing fixtures do not adequately illuminate the new equipment.

Violations & Fines

Installing an electric vehicle charging station without the required screening, without ADA-accessible provision, or without adequate nighttime lighting when the station operates after dark violates Sec. 24-63. As an accessory-use standard within chapter 24, noncompliance is enforced as a zoning violation under Sec. 24-22, a misdemeanor fined $10 to $1,000, with each additional 30-day period of noncompliance treated as a separate offense.

Frequently Asked Questions

Do I need a special permit to add EV chargers to my parking lot?
No. Sec. 24-63 allows electric vehicle charging stations as an accessory use to off-street parking in every zoning district in James City County, so no special use permit or rezoning is required.
Can EV charging spaces count toward my required parking?
Yes. Sec. 24-63 specifically allows parking spaces designated for EV charging to be counted in the calculation for meeting a site's minimum off-street parking requirement.
Does my EV charging station need to be screened?
Yes. All charging stations must be screened from outside the parking lot with landscaping, fencing or berms, and stations retrofitted into an existing lot may need additional landscaping if the planning director finds current screening inadequate.

Sources & Official References

Other rules in James City County

All James City County rules

Compare James City County to another location·View the Virginia parking rules overview

Get notified when EV Charging in James City County, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.