Skip to main content
CityRuleLookup

Los Angeles, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

EV Capable minimum
30% of parking spaces
EV Ready minimum
25% of spaces, 1+ per unit
EV Charger tier (20+ units)
10% with installed Level 2 EVSE
Minimum branch circuit
40 amperes
Enforcing agency
LA Dept. of Building and Safety

Summary

Los Angeles requires new multi-family buildings and residential parking facilities to wire a share of parking spaces for future EV charging. Under LAMC § 99.04.106.4.2.1 and .4.2.2, projects must provide EV Capable, EV Ready, and (for 20+ unit projects) fully equipped EV Charger spaces, with percentages set by project size.

When parking is provided, parking spaces for new multi-family dwellings, hotels and motels shall meet the requirements of Sections 99.04.106.4.2.1 and 99.04.106.4.2.2... EV Capable. Thirty percent of the total number of parking spaces on a building site, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE... EV Ready. Twenty-five percent of the total number of parking spaces, but in no case less than one per multi-family dwelling unit, shall be equipped with low power Level 2 EV charging receptacles.

Source: Cal. Civil Code §1947.6 — EV Charging in RentalsView official code

Full Breakdown

2, sets tiered EV infrastructure mandates tied to building size. " A minimum of 25 percent of spaces (never less than one per dwelling unit) must go further and be EV Ready, fitted with a low-power Level 2 charging receptacle; no more than one receptacle is required per unit even if a unit has multiple spaces. 2) face a third tier: 10 percent of spaces must actually be equipped with installed Level 2 EVSE chargers, with at least one charger sited in any common-use parking area for shared use by residents or guests.

3 kW simultaneously per station, on a branch circuit of at least 40 amperes with EVSE rated at least 30 amperes. Calculations for required spaces are always rounded up. 2. 1, except stations serving public accommodations, public housing, motels, and hotels, which instead follow California Building Code Chapter 11B accessibility rules.

Violations & Fines

Compliance is verified by the Los Angeles Department of Building and Safety (LADBS) at plan check and final inspection: construction documents must show proposed EV space locations and demonstrate panel capacity before a certificate of occupancy issues. There is no requirement that EV Ready or EV Charger spaces be usable before receptacles or chargers are actually installed, but the EV Capable wiring and labeled panel space must exist at build-out. Projects that fail to show adequate electrical capacity or mislabel the panel directory can be held up at inspection until corrected, since this is a building-code mandate enforced through the standard permitting process rather than a separate citation scheme.

Frequently Asked Questions

Does every apartment building in LA need EV chargers installed?
Not immediately. New multi-family projects must wire 30 percent of spaces as EV Capable and make 25 percent EV Ready with receptacles, but actual installed Level 2 chargers (10 percent) are only mandatory once a project reaches 20 or more dwelling units or guest rooms under LAMC § 99.04.106.4.2.2.
Can a developer skip EV Capable wiring by installing chargers instead?
Yes. If Level 2 EVSE chargers are installed in a number equal to or greater than the required EV Capable spaces, that requirement is satisfied; installing fewer chargers still reduces the EV Capable count on a one-for-one basis under § 99.04.106.4.2.1.
Do parking lifts have to include EV Ready spaces?
No. Areas of parking facilities served by parking lifts are explicitly exempted from the EV Ready requirement in both the under-20-unit and 20-or-more-unit tiers of § 99.04.106.4.2.

Sources & Official References

Other rules in Los Angeles

All Los Angeles rules

California rules heatmap·Compare Los Angeles to another location·View the California parking rules overview

Get notified when EV Charging in Los Angeles, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Los Angeles County handle ev charging.

South Gate, CA
Light Restrictions
Santa Clarita, CA
Light Restrictions
Santa Monica, CA
Some Restrictions
Downey, CA
Some Restrictions
El Monte, CA
Some Restrictions
Carson, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Palmdale, CA
Some Restrictions