Key Facts

Use status
Permitted accessory use, no special permit
Added
Ord. No. 2015-20, Dec. 14, 2015
Front yard (detached)
60 feet if 10+ feet from house
Side/rear yard (detached)
3 feet
Height cap
12 feet in residential districts

Summary

Schenectady lists electric vehicle charging stations among the permitted accessory uses allowed on any lot alongside a principal building, added to the zoning code by Ord. No. 2015-20. The ordinance sets no separate standard for the equipment itself, so a charging station is folded into the same accessory-structure yard and height rules that already govern sheds, garages and similar structures.

ELECTRIC VEHICLE CHARGING STATION A system for the charging of an electric vehicle. Components typically include a charging kiosk and transformer. ... Permitted accessory uses and structures. Accessory uses and structures include, but are not limited to, the following list of examples: ... (14) Electric vehicle charging stations. ... All detached accessory structures 10 feet or more from the principal structure are subject to the following minimum yard requirements: (a) Front yard: 60 feet. (b) Rear and side yards: three feet. ... In all residential districts, accessory structures may not exceed 12 feet in height.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4990798; v11 updated 2026-04-13; through 04-13-2026).

Full Breakdown

City Code Section 264-29B(14) simply adds 'electric vehicle charging stations' to the list of accessory uses and structures permitted in every zoning district under Section 264-29A, alongside private garages, home gardening and swimming pools. The definitions section, Section 264-2, describes an electric vehicle charging station as 'a system for the charging of an electric vehicle,' typically a charging kiosk paired with a transformer, and both entries were added by the same 2015 ordinance, No. 2015-20. Because the City chose not to write a dedicated setback, height or screening standard for charging equipment, a station is governed by the general bulk rules in Section 264-29D that apply to detached accessory structures as a class: if the station sits 10 feet or more from the principal building, it must keep a 60-foot front yard and a three-foot side or rear yard, and in a residential district it cannot exceed 12 feet in height.

A unit built onto or within 10 feet of the principal structure is instead treated as part of that structure and simply follows the applicable district's front, side and rear yard requirements. No special use permit, site plan review or Planning Commission approval attaches specifically to charging equipment: it is a by-right accessory use like a garage or a patio, subject only to the ordinary building and electrical permit process the Building Inspector applies to any new accessory structure or equipment installation.

Violations & Fines

Because charging stations carry no dedicated violation clause, the City enforces them the same way it enforces any other accessory structure that violates Section 264-29's placement rules: a station built inside a required front, side or rear yard, or one that exceeds the 12-foot residential height cap, is a zoning nonconformity the Building Inspector can cite and order corrected or relocated, the same remedy used against an oversized shed or an out-of-place garage.

Frequently Asked Questions

Do I need a special permit to install an EV charger in Schenectady?
No. City Code Section 264-29B(14) lists electric vehicle charging stations as a permitted accessory use in every zoning district, the same category as a private garage or a patio. You still need the standard building and electrical permits for the installation, but no special use permit or Planning Commission review applies specifically to the charger.
How far from my property line can I put a charging station?
If the station sits 10 feet or more from your house, it counts as a detached accessory structure under Section 264-29D and must keep a 60-foot front yard and a three-foot side or rear yard. A charger mounted on or within 10 feet of the house instead follows your district's ordinary yard requirements for the principal building.
Is there a height limit on charging equipment?
Yes, if it is treated as an accessory structure. Section 264-29D(5) caps accessory structures in residential districts at 12 feet, so a charging kiosk or canopy built as a freestanding structure has to stay under that limit; nonresidential districts instead cap accessory structures at the height allowed for the district's principal buildings.

Sources & Official References

Other rules in Schenectady

All Schenectady rules

New York rules heatmap·Compare Schenectady to another location·View the New York parking rules overview

Get notified when EV Charging in Schenectady, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.