Trenton, NJ Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Multi-family threshold
5+ dwelling units
Make-Ready share
15% of off-street parking
Full EVSE buildout
Within 6 years of C.O.
Accessible EVSE
At least 5% of spaces
Retailer exemption
25 or fewer parking spaces
Parking credit
1 EVSE space counts as 2

Summary

Trenton requires new multi-family buildings with five or more units, and most other new parking lots and garages, to install electric-vehicle charging infrastructure under City Code § 315-10.6. Multi-family projects must make 15% of parking Make-Ready and fully wire it within six years of occupancy; commercial lots follow a sliding scale by space count.

C. Requirements for New Installation of EVSE and Make-Ready Parking Spaces. 1. As a condition of preliminary site plan approval, for each application involving a multi-family dwelling with five or more units of dwelling space, which includes a multi-family dwelling that is held under a condominium or cooperative form of ownership, a mutual housing corporation, or a mixed-use development, the developer or owner, as applicable, must: a. Prepare as Make-Ready parking spaces at least 15% of the off-street parking spaces, and install EVSE in at least one-third of the 15% of Make-Ready parking spaces. b. Within three years following the date of the issuance of the certificate of occupancy, install EVSE in an additional one-third of the original 15% of Make-Ready parking spaces. c. Within six years following the date of the issuance of the certificate of occupancy, install EVSE in the final one-third of the original 15% of Make-Ready parking spaces. d. Throughout the installation of EVSE in the Make-Ready parking spaces, at least 5% of the electric vehicle supply equipment shall be accessible for people with disabilities.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4853025; v21 updated 2025-12-16; through 12-16-2025).

Full Breakdown

6, EVSE and Make-Ready parking installations are a permitted accessory use in every zoning district and cannot be denied a variance. For a multi-family development of five or more dwelling units, including condominium, cooperative, and mixed-use projects, the developer must prepare at least 15% of off-street parking spaces as Make-Ready at preliminary site plan approval, wire one-third of that 15% with actual EVSE immediately, another third within three years of the certificate of occupancy, and the final third within six years. At least 5% of the installed EVSE must be accessible for people with disabilities.

Parking lots and garages outside the multi-family rule follow a sliding scale: one Make-Ready space for 50 or fewer total spaces, two for 51 to 75, three for 76 to 100, four (one accessible) for 101 to 150, and 4% of total spaces (5% accessible) above 150 spaces; installing EVSE outright satisfies the Make-Ready obligation. Retailers with 25 or fewer off-street spaces and single-family homeowners are exempt entirely. Each EVSE or Make-Ready space must be at least nine feet wide by 18 feet long, and a space fitted with EVSE or Make-Ready equipment counts as two spaces toward minimum parking requirements, capped at a 10% reduction in required parking.

Publicly-accessible EVSE spaces must show green pavement or curb markings, a charging pictograph, and posted signage listing hours, fees, and a 24-hour equipment-problem contact number.

Violations & Fines

Publicly-accessible EVSE spaces are monitored by the Trenton Police Department under N.J.S.A. 40:48-2 and enforced like any other parking regulation: a non-electric vehicle parked in one, or an EV parked but not connected to the charger, is subject to fines and vehicle impoundment. The Zoning Officer enforces installation and signage requirements under § 315-10.6, applying the same enforcement and penalty provisions as any other land-use violation, including the citywide general penalty of up to a $2,000 fine per § 1-17.

Frequently Asked Questions

Does a new Trenton apartment building have to install EV chargers?
Yes. Any multi-family development with five or more units must set aside at least 15% of its off-street parking as Make-Ready under § 315-10.6, wiring the first third with actual EVSE immediately and the rest over six years after the certificate of occupancy.
Can I park a gas-powered car in an EV charging space in Trenton?
No. Publicly-accessible EVSE spaces are reserved for connected electric vehicles and are enforced by Trenton Police under N.J.S.A. 40:48-2. A non-electric vehicle parked there, or an EV left unplugged, is subject to fines and impoundment.
Do single-family homes in Trenton need EV charging equipment?
No. Section 315-10.6 exempts single-family homeowners and retailers with 25 or fewer off-street parking spaces from any requirement to install electric vehicle supply equipment or Make-Ready spaces.
Does installing an EV charger require a Trenton zoning variance?
No. An application solely for EVSE or Make-Ready parking is a permitted accessory use in every zoning district and cannot be denied a variance; at an existing gas station or retail site it can be approved through a zoning permit without site plan review.

Sources & Official References

Other rules in Trenton

All Trenton rules

Compare Trenton to another location·View the New Jersey parking rules overview

Get notified when EV Charging in Trenton, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.