Tucson, AZ Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
UDC § 7.4.11, Required Number of EVSE
Multifamily EV Ready
10% of required parking spaces
Multifamily EV Capable
20% of required parking spaces
Mobile home standard
1 EV Ready space per dwelling unit
Accessible EV spaces
4% of EV spaces, minimum one, ADA-compliant
Level 3 credit
1 fast charger counts as 3 EV spaces
Adopted by
Ordinance 11953, August 23, 2022

Summary

Tucson requires new multifamily and group-dwelling projects to provision electric-vehicle charging under UDC § 7.4.11. No spaces need a fully installed charger, but 10% of required parking must be EV Ready, wired with a marked, dedicated circuit, and 20% must be EV Capable, with conduit and panel capacity reserved for future charging. Mobile home developments must provide one EV Ready space per unit.

B. Minimum Required EVSE 1. The percentage of total required motor vehicle parking spaces that must also have access to at least Level 2 EVSE for specific Land Use Group, Class and Types are listed in Table 7.4.11-1 below. The required EVSE parking spaces shall be based upon the total number of parking spaces provided following any approved parking reductions or modifications. Table 7.4.11-1: Minimum Required EVSE — RESIDENTIAL USE GROUP: Mobile home: EV Installed None required, EV Ready Required 1 per unit, EV Capable Required None required. Multifamily Dwellings and Group Dwellings: EV Installed None required, EV Ready Required 10%, EV Capable Required 20%.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-150: Current through June 23, 2026).

Full Breakdown

11 of the Unified Development Code sets minimum electric-vehicle-supply-equipment requirements as a percentage of required off-street motor vehicle parking, calculated after any approved parking reductions or modifications. 11-1 sets three tiers for the Multifamily Dwellings and Group Dwellings use class: no spaces require a fully installed EV Installed charger, 10% of required parking must be EV Ready, and 20% must be EV Capable. Mobile home developments have a separate standard, one EV Ready space per dwelling unit, with no EV Installed or EV Capable minimum.

12 defines what each tier requires on site: an EV Installed station must be securely anchored and identified with signage and pavement markings bearing an EV symbol, and must be accessible for charging during business hours at minimum. An EV Ready space needs its dedicated outlet permanently marked 'EV Ready' and its branch circuit identified the same way in the service panel directory, so a resident can plug in with their own cable. An EV Capable space only needs the raceway termination and reserved panel capacity marked 'EV Capable' for future buildout, the cheapest tier, meant to future-proof the site without installing conductors yet.

2 layers on an accessibility requirement: at least 4% of EV charging spaces in any parking facility (never less than one) must also meet accessible parking space design standards, separate from the building's required ADA parking count. 4. These EV provisions were adopted by Ordinance 11953 on August 23, 2022, as part of Tucson's UDC electric-vehicle infrastructure package.

Violations & Fines

The UDC sets no dedicated EVSE fine, so a multifamily project that fails to provide its required EV Ready or EV Capable spaces is enforced like any other unspecified UDC violation, under Tucson Code § 1-8's general penalty: up to a $2,500 fine, up to six months' imprisonment, or up to 36 months' probation, in the city magistrate's discretion. Each day the deficiency continues is a separate offense under § 1-8(3).

Frequently Asked Questions

Does a new Tucson apartment complex have to install EV chargers?
Not fully installed ones. UDC § 7.4.11 and Table 7.4.11-1 require zero EV Installed chargers for Multifamily Dwellings and Group Dwellings, but 10% of required parking spaces must be EV Ready, wired with a marked, dedicated circuit, and 20% must be EV Capable, meaning conduit and panel capacity are reserved for a charger to be added later.
What's the difference between EV Ready and EV Capable parking spaces in Tucson?
Per UDC § 7.4.12, an EV Ready space has a permanently marked outlet and an identified branch circuit so a resident can plug in with their own cable. An EV Capable space is cheaper to build: only the raceway termination and reserved electrical panel capacity are marked, with no outlet installed until the space is later upgraded.
How many EV charging spaces does a mobile home community need in Tucson?
One EV Ready space per dwelling unit, per Table 7.4.11-1 of UDC § 7.4.11: no EV Installed or EV Capable spaces are separately required for mobile home developments, unlike the tiered 10%/20% standard that applies to multifamily and group dwellings.
Do any of the required EV spaces have to be accessible?
Yes. UDC § 7.4.11.B.2 requires at least 4% of EV charging spaces in any parking facility, never fewer than one, to meet accessible parking space design standards under the International Building Code, in addition to the project's regular ADA parking count.

Sources & Official References

Other rules in Tucson

All Tucson rules

Compare Tucson to another location·View the Arizona parking rules overview

Get notified when EV Charging in Tucson, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.