Rothschild, WI Parking Rules: Loading Zones (2026)
Key Facts
- Minimum size
- 60 ft long x 12 ft wide
- Vertical clearance
- 14 feet minimum
- Paving required
- unit pavers or concrete
- Backing into ROW
- not allowed to load/unload
- Counts toward parking?
- no, separate requirement
- Penalty
- $100-$1,000 per offense (§ 590-181)
Summary
Any commercial, business or industrial lot in Rothschild must provide an off-street loading area under Village Code § 590-86. Loading areas must be at least 60 feet long and 12 feet wide with 14 feet of vertical clearance, kept clear of the required front or street yard setback, and paved with unit pavers or concrete. Trucks cannot back into the public right-of-way to load.
A. Loading areas. For every lot on which a commercial, business, or industrial use is hereafter established, space with access to a public street or alley shall be provided for the loading and unloading of vehicles off the public right-of-way. ... (3) All loading areas shall be a minimum of 60 feet in length and 12 feet in width. All required loading areas shall have a minimum vertical clearance of 14 feet. (4) ... In no instance shall loading areas rely on backing movements into public rights-of-way. (5) All required loading areas and their access drives shall be paved with unit pavers, asphaltic concrete or portland cement concrete. (6) The use of all required loading areas shall be limited to the loading and unloading of vehicles. Said area shall not be used to provide minimum required parking spaces. ... B. Bus and truck terminals. Sufficient space shall be provided to accommodate the maximum number of buses or trucks to be stored or to be loaded or unloaded at the terminal at any one time.
Full Breakdown
Village Code § 590-86 sits in Chapter 590's site-design article and applies the moment a commercial, business or industrial use is established on a lot: the owner must provide space, with access to a public street or alley, for loading and unloading vehicles off the public right-of-way. The dimensional standard is specific: every required loading area must measure at least 60 feet in length and 12 feet in width, with a minimum vertical clearance of 14 feet, so it can actually accommodate a delivery truck or box trailer.
The area has to sit on the private lot itself, clear of any required front or street yard setback, and it cannot be positioned so a truck must back into the public right-of-way to use it. Access drives and the loading surface itself must be paved with unit pavers, asphaltic concrete or portland cement concrete, the same paving standard the code applies to parking lots. The code closes an obvious loophole: a business cannot double-count its loading area as part of the off-street parking supply required elsewhere in Chapter 590, and no part of a vehicle may extend into a public street right-of-way while loading or unloading is underway.
Bus and truck terminals get their own one-sentence standard: sufficient space must be provided to store, load, and unload the maximum number of buses or trucks the terminal handles at any one time. These requirements are reviewed as part of the Planning and Zoning Commission's site plan approval process for new commercial, business, or industrial development.
Violations & Fines
Zoning Chapter 590 makes any development or structure built in violation subject to enforcement by the Zoning Administrator, who refers cases to the Village prosecutor. Village Code § 590-181 sets a forfeiture of $100 to $1,000 per offense, with each day of a continuing violation charged as a separate offense, plus costs, assessments, surcharges and fees. The Village can also seek an injunction to abate a violation as a public nuisance.
Frequently Asked Questions
Does every commercial building in Rothschild need a loading area?
Can a delivery truck back into the street to reach a loading dock?
Can a business use its loading area to satisfy required parking?
Sources & Official References
Other rules in Rothschild
Compare Rothschild to another location·View the Wisconsin parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Loading Zones in Nearby Cities
How other cities in Marathon County handle loading zones.