Short-term rental permit rules in Lake Havasu City, AZ β also called Airbnb permits, vacation rental licenses, or STR registration β list the application steps, fees, and operating requirements for hosting.
Chapter 5.20 (Vacation Rentals), effective March 1, 2023, requires every short-term rental to obtain an annual city permit at $250/year before renting. Failure to permit carries a $1,000 monthly penalty.
Lake Havasu City Code Chapter 5.20 was adopted under Arizona's 2022 short-term rental authorizing statute (A.R.S. Β§9-500.39) and took effect March 1, 2023. Section 5.20.025 requires every owner to file a permit application listing the property address, owner contact, and a 24-hour emergency point of contact, plus proof of TPT (Transaction Privilege Tax) licensure and notice to neighbors within 30 days of permit issuance. The annual permit fee is $250 and the permit is valid for one year. Permits are processed through the city's MuniRevs portal at lhcaz.munirevs.com.
Operating without a permit carries a $1,000 fine for every month of non-compliance after a 30-day written notice. Other violations of Chapter 5.20 escalate: first offense $500 or one night's rent (whichever is greater); second offense $1,000 or two nights' rent; three or more violations in 12 months $3,500 or three nights' rent. Permits may be revoked or suspended.
Other ordinances people look up for this city. Green dot = verified primary-source excerpt.
Lake Havasu City, AZ
Inoperable vehicles stored in front yards or visible from the right-of-way are a public nuisance under Β§ 8.08.020 and may be towed after notice. Junk vehicle...
Lake Havasu City, AZ
Chapter 10.12 governs street parking. Section 10.12.040 lists prohibited stopping/standing/parking locations including within 15 ft of fire hydrants, 30 ft o...
Lake Havasu City, AZ
Section 14.04.02 requires RV/boat trailer parking spaces on residential property to be at least 10 ft Γ 36 ft (360 sq ft). Occupying an RV or travel trailer ...
Lake Havasu City, AZ
Walls and fences over 6 feet in height require a building permit under Chapter 12.08 (the city's adopted Building Code). Retaining walls over 4 feet, or with...
Lake Havasu City, AZ
Every swimming pool, spa, or contained body of water must be enclosed by a minimum 5-foot barrier with self-closing, self-latching gates opening outward. Gap...
Lake Havasu City, AZ
Section 14.06.02 measures fence/wall height vertically from adjacent finished grade on the interior side. Standard residential limit is 6 ft in side/rear yar...
See how Lake Havasu City's permit requirements rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.