Hoover, AL Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit fee
- $500 flat administrative fee
- Surety deposit
- $500 to $5,000, sized by engineering
- Deposit refund
- After inspector confirms repair
- Repair deadline
- One week after work completes
Summary
Cutting a street or disturbing city right-of-way in Hoover requires a $500 permit plus a refundable surety deposit sized to the work, collected before repairs are inspected.
A fee of five hundred dollars ($500.00) shall be charged for each street-cutting permit and/or right of way ("ROW") disturbance. This purpose of this fee is to cover the administrative costs associated with review of permit applications. In addition to the administrative fee, each person filing an application for a permit to cut a street in the city shall, before such permit is issued, furnish to the city clerk a surety deposit applicable to the proposed work in the city. Said surety deposit shall be a minimum of five hundred dollars ($500.00), but not to exceed five thousand dollars ($5,000). The engineering department will determine the deposit amount for each cut based on the size of the proposed cut and the age and condition of the roadway. Said deposit shall be returned to the person purchasing the permit after the engineering department inspector has ascertained that the street cut has been satisfactorily repaired. If the purchaser fails to satisfactorily repair the cut street within one week from the completion of the work for which the said street was cut, the city shall apply any or all of said deposit forward the cost of having the street satisfactorily repaired, and the balance, if any, shall be refunded to the purchaser of the permit.
(Ord. No. 325, § 1, 7-20-81; Ord. No. 23-2626, § 1, 10-16-23)
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 23).
Full Breakdown
Anyone cutting a city street or disturbing the right-of-way must pay a $500 administrative fee and post a surety deposit with the city clerk before the permit issues. The engineering department sets the deposit, a minimum of $500 and up to $5,000, based on the size of the cut and the road's age and condition. The deposit is refunded once an inspector confirms the cut was repaired properly; if repairs aren't finished within one week of completing the work, the city uses the deposit to pay for the repair instead.
Violations & Fines
Failing to repair a street cut within one week of finishing work lets the city use your surety deposit to pay for the repair itself, with the engineering department billing any cost beyond the deposit.
Frequently Asked Questions
How much does a Hoover street-cut permit cost?
When do I get my deposit back?
Sources & Official References
Other rules in Hoover
Compare Hoover to another location·View the Alabama sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Encroachment Permits in Nearby Cities
How other cities in Jefferson County handle encroachment permits.