Hudson, NH Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permitting agency
- Board of Selectmen or its designee
- Permit required for
- any surface disturbance in highway right-of-way
- Work start deadline
- within 15 days of permit issuance
- Responsibility period
- 1 year after backfill/resurfacing
- Violation fine
- $50 flat (§ 284-10)
- Utility conduits
- location must be approved before installation (§ 284-11)
Summary
Hudson requires a permit from the Board of Selectmen or its designee before anyone disturbs the surface within a highway right-of-way, covering excavation, trenching and buried-utility work under Town Code Chapter 284. The rule reaches contractors, utilities and private property owners who cut into town streets or roads for any private installation.
§ 284-1. Permit required. ... No person, firm, contractor or corporation shall disturb the surface within the highway right-of-way without first obtaining a permit from the Board of Selectmen or its designee. ... ... § 284-10. Violations and penalties. ... Any violation of this Article will be subject to a fine of fifty dollars ($50.). ... ... § 284-11. Approval required. Effective the date of this Article, any and all pipes, ducts, cables, etc., laid in any street or road in the Town of Hudson shall have the location of said pipes, ducts, cables, etc., approved by the Board of Selectmen or its designee prior to installation.
Full Breakdown
Chapter 284, Article I (adopted 1963, rewritten 1988) sets the excavation permit rule: no person, firm, contractor or corporation may disturb the surface within the highway right-of-way without first getting a permit from the Board of Selectmen or its designee (§ 284-1). Work must start within 15 days of the permit issuing (§ 284-7), and excavation cannot leave open trenches or dirt that blocks traffic; in bad weather the excavator must keep the cut passable (§ 284-8). Backfill is specified by surface type: topsoiled ground gets twelve-inch compacted layers topped with six inches of topsoil (§ 284-2), gravelled ground gets twelve-inch layers topped with 18 inches of compacted gravel, and paved areas get 18 inches of compacted gravel with the pavement edge trimmed to a straight line and restored with either a two-inch hot-asphalt binder plus a one-and-one-half-inch finish course or a four-inch cold-patch layer sealed with tar (§ 284-3).
Whoever disturbs the ground stays responsible for that excavation for one full year after backfilling or resurfacing (§ 284-6), and the Board of Selectmen or its designee must be notified to inspect before the final surface goes down and again once it is complete (§ 284-9). A separate article covers utility conduits: any pipe, duct or cable laid in a Hudson street or road needs its location approved by the Board of Selectmen or its designee before installation (§ 284-11). Exceptions to the backfill specs and any bonding requirement are both left to the Board's discretion (§§ 284-4, 284-5).
Violations & Fines
Violating the excavation and permit article carries a flat fifty-dollar fine (§ 284-10). Because the responsible party remains on the hook for the excavation for a full year, the Board of Selectmen can also require a bond up front and can withhold sign-off on the final surface inspection until backfill and paving meet the chapter's specifications.
Frequently Asked Questions
Do I need a permit to dig up my driveway apron in Hudson, NH?
What happens if I don't restore the pavement correctly?
Does running a utility line under a Hudson street need separate approval?
What's the fine for excavating without a Hudson right-of-way permit?
Sources & Official References
Other rules in Hudson
Compare Hudson to another location·View the New Hampshire sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Encroachment Permits in Nearby Cities
How other cities in this county handle encroachment permits.