New Britain, CT Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Sec. 21-16
Permitting agency
Department of Public Works
Permit type
Building permit
Initial permit term
1 month
Renewal
Successive 1-month extensions, police chief certifies traffic impact
Required nightly lighting
Battery-powered only, sunset to sunrise

Summary

Anyone who wants to place or keep building material on a New Britain street, such as during construction, needs a building permit from the department of public works under Code of Ordinances Sec. 21-16. The permit expires one month after it issues, renewable in successive one-month stretches if the police chief certifies the storage isn't unreasonably blocking traffic.

(a)No person shall place or maintain any building material on any street without a building permit from the department of public works. (b)Any person permitted to store such material in any street shall:(1)Provide a safe and convenient passage for public travel around or over the material and keep the passage free from all refuse and debris; ... (3)Place and maintain, from sunset of each day to sunrise of the next day, a sufficient number of battery-powered lighting devices around the stored material to provide for public safety. The use of lighting by gasoline, kerosene, or other flammable type lamps is prohibited; and ... (c)Each permit for the storage of such material in any street while erecting or repairing any building shall expire one month after the date it is issued. The department of public works may approve the extension of a permit for successive periods of one month each upon certification in writing by the chief of police that such storage does not constitute an unreasonable interference with traffic.

Full Breakdown

Sec. 21-16(a) bars placing or maintaining any building material on a street without a building permit from the department of public works, covering the common construction-site practice of stockpiling lumber, brick, or fill along the curb. Subsection (b) attaches conditions to any permit granted: the permittee must keep a safe, convenient passage open around or over the material for public travel and free of refuse and debris; must let water flow freely in the street gutters; must light the stored material every night from sunset to sunrise with battery-powered devices, since gasoline, kerosene, or other flammable lamps are expressly barred; and must assume all responsibility for, and hold the city harmless from, any damage caused by failing to meet those conditions.

Subsection (c) limits each permit's life to one month from its issue date, though the department of public works may approve successive one-month extensions once the chief of police certifies in writing that the storage isn't causing unreasonable interference with traffic. The section, sourced from 1970 Code Sec. 20-24 and amended by ordinance No. 26824-1 in 2002, cross-references Chapter 7's building regulations, tying the street-storage permit to whatever building permit is driving the construction in the first place. It sits in the same article as Sec.

21-15's general street-obstruction permit and bond, but Sec. 21-16 is the specific rule for construction-material staging rather than fences, bridges, or drain fills, and it requires a building permit rather than the Sec. 21-15 bond.

Violations & Fines

Placing or keeping building material on a New Britain street without the department of public works building permit violates Sec. 21-16(a). A permit holder who fails to keep a clear passage, let gutters drain, or light the material nightly is liable for any resulting damage and must hold the city harmless under Sec. 21-16(b); letting a permit lapse past its one-month term also puts the material back in violation.

Frequently Asked Questions

Do I need a permit to store lumber on the street during a renovation?
Yes. Sec. 21-16(a) requires a building permit from the department of public works before placing or maintaining any building material on a New Britain street, even temporarily during a repair or construction project.
How long does the street-storage permit last?
One month from the date it's issued, under Sec. 21-16(c). The department of public works can approve successive one-month extensions, but only after the chief of police certifies in writing that the stored material isn't unreasonably interfering with traffic.
What safety steps does the permit require?
Sec. 21-16(b) requires keeping a safe passage around the material for public travel, letting the street gutters drain freely, and lighting the material every night from sunset to sunrise with battery-powered devices; gasoline, kerosene, or other flammable lamps are specifically prohibited.
Who is responsible if the stored material causes an accident?
The permit holder. Sec. 21-16(b)(4) makes the person storing the material responsible for any damage caused by failing to keep a clear passage, drain the gutters, or maintain proper nighttime lighting, and requires holding the city harmless for that damage.

Sources & Official References

Other rules in New Britain

All New Britain rules

Compare New Britain to another location·View the Connecticut sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in New Britain, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.