New Britain, CT Sidewalk & Pedestrian Rules: Obstruction Rules (2026)
Key Facts
- Governing section
- Sec. 21-15
- Permitting agency
- Department of Public Works
- Bond required
- Before the permit issues
- Prohibited acts
- Refuse, fences, bridges, drain or catch-basin fill, hydrant use
- Cost-recovery tool
- Property lien under Sec. 21-17
Summary
New Britain bars obstructing any street or public place, including dumping refuse, placing fences, bridging a street, or blocking a drain or hydrant, unless the department of public works first issues a permit under Code of Ordinances Sec. 21-15. That permit won't issue until the applicant posts a bond covering the city against accident claims from the obstruction.
(a)Without a permit from the department of public works, no person shall obstruct any street or any other public place by:(1)Depositing refuse or placing fences or any impediment whatsoever on such streets;(2)Constructing any bridge over such street;(3)Filling any canal, drain, or gutter;(4)Obstructing or altering the course of any run of water;(5)Using any hydrant; or(6)Filling any catch basin.(b)No permit shall be issued to any person to obstruct any street, as provided in paragraph (a) of this section, until such person has filed a bond satisfactory in form with the department of public works, securing the city against any claim for damages from accidents resulting from such obstructions.
Full Breakdown
Sec. 21-15(a) lists six specific ways a person may not obstruct "any street or any other public place" without a department of public works permit: depositing refuse or placing fences or any impediment on the street; constructing a bridge over the street; filling a canal, drain, or gutter; obstructing or altering the course of a run of water; using a hydrant; or filling a catch basin. The section's cross-reference ties its origin to 1970 Code Sec. 20-23(a) and (c), later amended by ordinance No. 26824-1 in 2002.
Subsection (b) adds a financial condition on top of the permit itself: the department of public works cannot issue the obstruction permit until the applicant files a bond, satisfactory in form to the department, securing the city against any claim for accident damages that result from the obstruction. This bond requirement sits alongside the separate building-materials permit in Sec. 21-16 and the tree-cutting permission in Secs. 21-7 and 21-18, all administered by the same department for activity in the public right-of-way. The chapter's own footnote traces the city's underlying authority to G.S.
Sec. 7-148(c)(6)(C)(ii), which lets a municipality "keep open" and free from obstruction its streets, sidewalks, and public places. A separate section, Sec. 21-9, bars letting earth, gravel, sand or other mineral matter escape onto a street or right-of-way, and Sec. 21-17 lets the city recover, as a property lien, the cost of any work it performs when an owner refuses to pay for corrective work the city had to do under this chapter.
Violations & Fines
Obstructing a New Britain street or public place by dumping refuse, fencing it off, bridging it, filling a drain or catch basin, diverting water flow, or tapping a hydrant, without a department of public works permit and the required bond, violates Sec. 21-15. The chapter prints no standalone fine for this section; the city's remedy runs through the permit-and-bond system itself and, where the city must correct the obstruction, a lien against the property under Sec. 21-17.
Frequently Asked Questions
Can I put a temporary fence across a city street for an event?
Why does the city require a bond for an obstruction permit?
Does this cover blocking a storm drain?
What if I obstruct a street without getting a permit first?
Sources & Official References
Other rules in New Britain
Compare New Britain to another location·View the Connecticut sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.