Roseville, MN Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit issuer
- Public works director
- Required for
- Obstructing, excavating or placing anything in the right-of-way
- Before applying
- Register, pay fee, post bond or other security
- Construction bond
- 100 percent of estimated cost of the work, unless director sets less
- Work without permit
- Double the permit fee and double all other fees
- Denial review
- Written request to city council, then binding arbitration
Summary
In Roseville, no person can obstruct or excavate a right-of-way, or install or place anything in it, without first obtaining the appropriate right-of-way permit from the public works director. An obstruction permit covers equipment that hinders free and open passage, for the extent and duration the permit specifies, and extensions need a supplementary application before expiry.
(a) Permit required. ... Except as otherwise provided in this Code, no person may obstruct or excavate any right-of-way or install or place in the right-of-way without first having obtained the appropriate right-of-way permit from the director to do so. ... (2) Obstruction permit. An obstruction permit is required by a registrant to hinder free and open passage over the specified portion of right-of-way by placing equipment described therein on the right-of-way, to the extent and for the duration specified therein. An obstruction permit is not required if a person already possesses a valid excavation permit for the same project. ... (b) Permit extensions. No person may excavate or obstruct the right-of-way beyond the date or dates specified in the permit unless such person makes a supplementary application for another right-of-way permit before the expiration of the initial permit and a new permit or permit extension is granted. ... (d) Permit display. Permits issued under this chapter shall be conspicuously displayed or otherwise available at all times at the indicated work site and shall be available for inspection by the director.
Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 2).
Full Breakdown
Section 706.08 is the permit requirement in Chapter 706, Right-of-Way Management. Subsection (a) forbids any person, except as otherwise provided in the Code, to obstruct or excavate any right-of-way or install or place in the right-of-way without first having obtained the appropriate right-of-way permit from the director. Chapter 706 defines the director as the director of the city public works department, and § 706.03 makes the director the principal city official responsible for administering rights-of-way and right-of-way permits. The Code's own term is right-of-way permit, covering excavation, obstruction and small-wireless facility permits. Chapter 706 does not use the label encroachment permit.
To obstruct means to place any object in a right-of-way so as to hinder free and open passage over that or any part of it, and § 706.02 defines right-of-way to include the surface and space above and below a public roadway, street, bicycle way and public sidewalk in which the city has an interest. An obstruction permit is not required if the person already holds a valid excavation permit for the same project.
Registration comes first. Section 706.05 requires each person who occupies, uses or seeks to occupy or use the right-of-way to register with the director by providing application information, paying a registration fee and posting a performance and restoration bond or other security acceptable to the director. During construction the bond must cover 100 percent of the estimated cost of the work, or a lesser amount the director sets. Section 706.06 requires a certificate of insurance naming the city as an additional insured.
The obstruction permit fee is set by the city council in an amount sufficient to recover the city cost, no permit issues without payment, and the city can allow payment within 30 days of billing (§ 706.11). The director can deny a permit for failure to meet the chapter's requirements or when necessary to protect public health, safety and welfare or the right-of-way and its current use (§ 706.16). Permits must be displayed or available at the work site (§ 706.08(d)). Section 706.05(c) excepts boulevard plantings and gardens from Chapter 706 permits.
Violations & Fines
Under § 706.19(b), a person who obstructs or excavates a right-of-way without first obtaining the necessary permit, outside an emergency, must obtain the permit afterward and, as a penalty, pay double the normal permit fee, pay double all other fees required by the chapter, and deposit with the director the fees necessary to correct any damage. Section 706.08(c) lets the city impose a delay penalty, set by council resolution, for unreasonable delays in obstruction, patching or restoration.
Frequently Asked Questions
Does Roseville issue a permit called an encroachment permit?
What if the director denies my right-of-way permit?
What happens if I start work in the right-of-way without a permit?
Sources & Official References
Other rules in Roseville
Compare Roseville to another location·View the Minnesota sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.