Skip to main content

Roseville, MN Parking Rules: Driveway Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Max width, LDR/LMDR house or duplex
26 feet at the property line
Max width, all other uses
36 feet with 10-foot flares
Side lot line setback
Residential driveway edge at least five feet away
Distance from street intersection
30 feet in LDR/LMDR; 40 feet elsewhere
Surface
Concrete, asphalt, brick pavers or approved hard surface
Notice to city
At least 24 hours before construction starts

Summary

Roseville caps a single-family or duplex driveway in the LDR and LMDR districts at 26 feet wide at the property line, with three-foot flares, and requires concrete, asphalt, brick pavers or other hard surface pavement approved by the public works director. Residential driveways must sit five feet from the side lot line.

(1) Maximum width. a. LDR and LMDR districts. For single-family and duplex principal structures within the LDR and LMDR districts, the maximum width of any driveway at the property line shall be 26 feet. In addition to the maximum width, at each side of the driveway where the driveway intersects the street, three-foot flares are permitted. The maximum driveway width for all other uses shall be 36 feet and 10-foot flares are permitted. ... (4) Intersection. On properties zoned LDR and LMDR, no driveway shall be located within 30 feet of any right-of-way of a street intersection. ... (7) Driveways. Driveways shall be constructed of concrete, asphalt, brick pavers or other hard surface pavement approved by the public works director. ... (9) Driveways on private property. Residential driveways shall be constructed so that the edge of the driveway nearest to the side lot line shall be a minimum of five feet from the side lot line.

View official code

Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 2).

Full Breakdown

Section 703.04(b) of the Roseville City Code sets the standards for driveways and parking lot aisles. For single-family and duplex principal structures in the LDR and LMDR districts, the maximum width at the property line is 26 feet, and three-foot flares are permitted on each side where the driveway meets the street. All other uses get a 36-foot maximum with 10-foot flares. Public safety facilities that are publicly owned and operated are exempt from the width limits. Driveway edges at the front property line must be at least ten feet apart, except in planned unit developments where the development agreement sets the distance.

On LDR and LMDR lots, no driveway can sit within 30 feet of a street intersection right-of-way. In every other zone the distance is 40 feet, measured along the property line from the corner right-of-way line. The minimum driveway angle is 60 degrees from a two-way access street and 30 degrees from a one-way street.

Surfacing is a hard-surface rule. Driveways must be concrete, asphalt, brick pavers or other hard surface pavement approved by the public works director, and Section 1013.11(f) repeats that all off-street parking areas and driveways must be bituminous asphalt, concrete, pavers, or other material approved by the city engineer. Where a concrete approach has no concrete curb or gutter, it is held back two feet from the roadway edge and the remaining two feet is hot mixed bituminous. The owner or builder must obtain a permit from the community development director before starting approach work. The driveway elevation at the property line must be no more than ten inches nor less than four inches above the street centerline.

Residential driveways must keep the edge nearest the side lot line a minimum of five feet from that line. One- and two-family dwellings with driveway access onto county or state roads must be designed so cars do not have to back into the street.

Section 703.03 adds process rules. Work in the street right-of-way must be done by a licensed contractor, but the community development director can waive that for an owner who builds or repairs a driveway and signs a hold harmless agreement. The director must be notified at least 24 hours before construction starts.

Violations & Fines

Section 703.04 prints no fine of its own. Enforcement runs through permits and plan review: Section 1013.11(a) requires every building permit application to include a site plan showing curb cuts, driveways, and parking, consistent with chapter 703, and the community development director must be given 24 hours notice before driveway construction starts. The requirements reach new driveways and major repairs or changes to old driveways that do not conform.

Frequently Asked Questions

How wide can my driveway be in Roseville?
For a single-family or duplex principal structure in the LDR or LMDR districts, the maximum width at the property line is 26 feet, plus three-foot flares at each side where it meets the street. All other uses can have a driveway up to 36 feet wide with 10-foot flares.
Does Roseville allow a gravel or dirt driveway?
No. Section 703.04(b)(7) requires driveways to be concrete, asphalt, brick pavers or other hard surface pavement approved by the public works director. Section 1013.11(f) separately requires off-street parking areas and driveways to be bituminous asphalt, concrete, pavers, or other material approved by the city engineer.
How close can a driveway be to my neighbor's lot line?
A residential driveway must be built so the edge nearest the side lot line is a minimum of five feet from that line. Driveway edges at the front property line must also be at least ten feet apart, except in planned unit developments where the development agreement sets the distance.
Can I build my own driveway apron in the right-of-way?
Work in the street right-of-way must be done by a licensed contractor, but the community development director can waive that for a driveway built or repaired by the property owner, who must sign a hold harmless agreement indemnifying the city. A permit is required before approach work, and the director needs 24 hours notice.

Sources & Official References

Other rules in Roseville

All Roseville rules

Compare Roseville to another location·View the Minnesota parking rules overview

Get notified when Driveway Rules in Roseville, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Driveway Rules in Nearby Cities

How other cities in this county handle driveway rules.

Saint Paul, MN
Some Restrictions