Key Facts
- Section
- SMC § 16.72.125
- Issuing authority
- Community Development Director
- Applies to
- All excavation/construction/repair in public ROW
- Pipe depth minimum
- 3 ft below gutter grade, misdemeanor if shallower
- Large excavations
- Coordination required over 300 lineal feet
Summary
Anyone digging, building, or repairing in a Stockton street, alley, or public place needs a permit first. Stockton Development Code § 16.72.125 requires an encroachment permit from the Community Development Director for all excavation, construction, maintenance, or repair work in the public right-of-way, including work done by other City departments and government agencies.
A. Permit. All excavations, construction, maintenance, and/or repairs in a public street, alley, or other public place in the City shall require an encroachment permit from the Director. Everyone, including any Department of the City or other governmental agency or authority, is required to obtain an encroachment permit to excavate/perform work in the public streets, alleys, or other public place in the City. ... D. Fees. The permittee, including any Department of the City, or other governmental agency to the extent permitted by law, shall pay the City an encroachment permit fee and reimburse the City for the costs of permit plan check, issuance, and inspection, as required by the Council's fee resolution.
Full Breakdown
125 governs any excavation, construction, maintenance, or repair in a public street, alley, or other public place, and the requirement is universal: even a City department or another governmental agency must obtain an encroachment permit before doing that work. Applications go to the Community Development Department and must show the work location, a description of the work, and compliance with the section's completion-of-work, annual utility work plan, and coordination and scheduling requirements. The Director may deny a permit outright when the work would be detrimental to public health, safety, or welfare, or when the applicant fails to meet the filing requirements.
Permittees pay an encroachment permit fee plus the City's costs for plan check, issuance, and inspection, set by Council fee resolution. Once issued, work must proceed with due diligence and minimize obstruction of the street, sidewalk, or alley; if the Director of Public Works finds a lack of progress or noncompliance, the City can complete the work itself at the permittee's expense after notice. Utilities installing underground conduit face added rules: pipes and mains must sit at least three feet below street gutter grade or two feet below other public places, and any utility must file an annual utility work plan and coordinate excavations over 300 lineal feet with the City's roadway maintenance schedule to avoid cutting into newly paved streets.
Violations & Fines
Laying a gas, water, sewer, or other pipe shallower than the section's depth minimums is expressly made a misdemeanor. More broadly, working in the right-of-way without a permit, ignoring a Director of Public Works notice to complete stalled work, or violating permit terms exposes a permittee to the City completing or correcting the work at the permittee's expense, on top of standard code enforcement remedies.
Frequently Asked Questions
Do I need a permit to dig up the street in front of my Stockton property?
Can Stockton deny my encroachment permit application?
What happens if I don't finish encroachment permit work on time?
Sources & Official References
Other rules in Stockton
California rules heatmap·Compare Stockton to another location·View the California sidewalk & pedestrian rules overview
See something wrong?