Woodbury, MN Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit types
- Excavation permit and obstruction permit
- Short obstruction exemption
- 8 hours or less for repairs
- Registration required first
- Sec. 20-68
- Permit display
- Conspicuous at work site at all times
- Governing section
- City Code Sec. 20-71
Summary
Anyone who wants to excavate or obstruct a Woodbury public right-of-way, including the boulevard next to a sidewalk, needs an excavation or obstruction permit first. The city also charges a delay penalty for work left incomplete past the permit deadline.
Permit required. Except as otherwise provided in this code, no person may obstruct or excavate any right-of-way without first having obtained the appropriate right-of-way permit from the city to do so.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 48).
Full Breakdown
City Code Sec. 20-71(a) bars any person from obstructing or excavating a right-of-way without first obtaining the appropriate permit from the city, and splits the requirement into two permit types. An excavation permit covers digging in the described part of the right-of-way and placing facilities there for the duration stated in the permit. An obstruction permit covers hindering free passage over a specified part of the right-of-way by placing equipment there, though it is not required if the person already holds a valid excavation permit for the same project, and is waived for obstructions of eight hours or less done to repair or maintain previously installed facilities.
Before that, Sec. 20-68 requires anyone who occupies, uses, or seeks to use the right-of-way, or place equipment or facilities in it, to register with the city and pay a registration fee; the section separately allows boulevard plantings, irrigation systems and underground pet fences without a permit or registration unless they connect to city utilities, in which case a permit becomes necessary. Sec. 20-71(b) requires a supplementary application before an initial permit expires if work will run past the permitted dates. Sec. 1000 subp. 3, for unreasonable delays in excavation, obstruction, patching or restoration, though force majeure delays such as inclement weather or labor disputes are excused.
Sec. 20-71(d) requires the permit to be conspicuously displayed at the work site at all times and available for city inspection. Sec. 20-72 lists what a complete application must include: registration, a permit application form with scaled drawings dimensioned to the back of curb or edge of pavement and property lines, and payment of permit fees, restoration costs and any money owed for prior obstructions.
Violations & Fines
Excavating or obstructing right-of-way without the required permit violates Sec. 20-71(a). Working past the dates stated in an issued permit without first filing a supplementary application and obtaining an extension violates Sec. 20-71(b), and unreasonable delays in completing excavation, obstruction, patching or restoration expose the permittee to a delay penalty set by city ordinance under Sec. 20-71(c).
Frequently Asked Questions
Do I need a permit to dig or place equipment in the Woodbury right-of-way?
Is a permit needed for a quick repair job?
What if my project runs past the permit's end date?
Sources & Official References
Other rules in Woodbury